21
5.3 Maintenance
The following inspections and maintenance tasks are recommended at least two
times per year for best controller performance:
•
Check that the controller is securely mounted in a clean and dry
environment.
•
Check that the airflow and ventilation around the controller is not blocked.
Clear all
dirt or fragments on the heat sink.
•
Check all the exposed wires to make sure insulation is not damaged for
serious sun exposure, frictional wear, dryness, insects or rats etc.
Maintain or replace the wires if necessary.
•
Tighten all the terminals. Inspect for loose, broken, or burnt wire
connections.
•
Check and confirm that the LED digital display is consistent. Pay attention
to
any troubleshooting or error indication. Take necessary corrective
action.
•
Confirm that all the system components are ground connected tightly and
correctly.
•
Confirm that all the terminals have no corrosion, insulation damaged, high
temperature or burnt/discolored sign, tighten terminal screws to the
suggested torque
•
Inspect for dirt, insects and corrosion, and clear up.
•
Check and confirm that lightning arrester is in good condition. Replace a
new one in time to avoid damaging of the controller and other equipment.
Warning: Risk of electric shock! Make sure all the power is turned off
before above operations, and then follow the corresponding inspections
and operations.