
9
TONiC RSLM20/RELM20 Functional Safety installation guide and safety manual Original instructions
3
Scale installation
NOTE:
‘Storage and handling’ on page 5
is followed.
1
Clean underside of scale using approved solvents
(see ‘Storage and handling’ on page 5)
.
4
Thoroughly mix and apply epoxy then remove
remaining backing liner.
Area for RGG-2 epoxy
(A-9531-0342)
6
Support
dowels
7
Remove excess
epoxy
or
5
Locate scale against dowels or ledge
and rotate down onto substrate.
Press down with firm finger
pressure.
2
Mark area for epoxy on
adhesive tape.
8
Mounting ledge
Thoroughly clean and degrease
the substrate with a
lint-free cloth.
Remove backing liner from one side
and stick to underside of scale.
Allow 24 hours for epoxy to cure fully, then
clean scale using Renishaw scale wipes
(A-9523-4040) or a clean, dry, lint-free cloth.