Installation Instructions for qualified personnel
■
Observe the manuals for
the indoor units and chillers
when installing the entire
system.
■
The indoor units and
chillers work independently.
A connecting line between
the two is not necessary.
■
Select an installation location
which allows air to flow
freely through the inlet and
outlet. See section "Minimum
clearances".
■
Do not install the unit in
the immediate vicinity of
devices which generate
intensive thermal radiation.
Installation in the vicinity
of thermal radiation reduces
the unit output.
■
Lift the unit only at intended
lifting points. Never apply loads
to the medium piping.
■
The medium connection lines,
valves and connections must be
insulated impervious to vapour
diffusion.
■
Seal off open lines to prevent
dirt getting in.
■
Make all electrical connections
in accordance with applicable
DIN and VDE standards.
■
Always ensure the electrical
cables are properly connected
to the terminals.
Otherwise there is a risk of fire.
■
Comply with all regulations
governing structural and
building requirements and
conditions with regard to
the installation site.
■
In the selection of
the installation site, pay
attention to the site itself
and to any possible acoustic
reflection from surrounding
units.
■
To avoid the transmission of
vibrations to the installation
site, the units must be installed
on vibration absorbing material
or on vibration decoupled
foundations.
In doing so, make sure that
the lines are also vibration
decoupled.
■
If the installation site must
fulfil special sound emission
requirements, these must
be realised on-site when
appropriate adjustments can be
made.
In these cases, please consult an
appropriate acoustics expert.
■
The units are tested in
the factory and require
only electrical and hydraulic
installation by a suitable
specialist.
Important notes prior
to installation
■
The unit must be kept upright
when transporting to a higher
elevation:
■
Check the contents of
the packaging for completeness
and check the unit for visible
transport damage.
Report any damage immediately
to your contractual partner and
the shipping company.
■
If necessary, also insulate
the condensate drainage line
(only units with HP-function).
In dual systems with cooling
and heating modes, the
requirements of the current
Energy-Savings-Ordinance
(EnEV) are to be complied with.
Transport
■
Transport the unit in its original
packaging as close as possible
to the installation location.
You avoid transport damage
by doing so.
■
The units may only be moved
as installed (upright) using
appropriate transport gear
(Figure 1).
Secure against tipping!
1
Standing transport
19
Содержание RVS 130 DC
Страница 2: ......
Страница 41: ...Dimensions Unit dimensions RVS 50 DC RVS 80 DC RVS 130 DC RVS 180 DC 41 ...
Страница 43: ...43 ...