Installation
NOTE
Installation may only be
undertaken by authorised
personnel.
Unit installation
1. Install the vibration absorbers
(accessories) under the system
(Figure 6
).
2. Attach the unit to the building
where structurally permitted.
3. Ensure that structure-borne
noise is not transferred to other
parts of the building.
4. Connect the medium lines.
Separating the
Transport pallet
The system is supplied with a pallet
for the purpose of transportation.
Remove this before installation.
Transport packaging
Transport pallet
Unit layout
RVS
60H
RVS
75H
RVS
100H
RVS
150H
Holediameter
14 mm
Load point A
16,5
17,5
18,5
21,5
Load point B
28,5
32,5
46,5
46,5
Load point C
11,5
13,5
31,5
33,5
Load point D
38,5
39,5
45,5
52,5
6 Weight loads
All values in kg
RVS 60H to RVS 150H
A
C
B
D
21
Содержание RVS 100H INOX
Страница 2: ......