Function test of the cooling and heating modes
1.
Remove the protective caps from the valves.
2.
Start the commissioning procedure by briefly
opening the shut-off valves on the outdoor
unit until the pressure gauge indicates a
pressure of approx. 2 bar.
3.
Check all connections for leaks with leak
detection spray and suitable leak detectors.
4.
If no leaks are found, fully open the shut-off
valves by turning them anti-clockwise using a
spanner. If leaks are found, remedy the faulty
connection. It is imperative that the vacuum
creation and drying steps are repeated.
5.
Activate the main circuit breaker or fuse.
6.
Use the remote control to switch on the unit
and select the cooling mode, maximum fan
speed and lowest target temperature.
7.
Check the overheating, outside, inside, outlet
and vaporisation temperatures and record
the measured values in the commissioning
report. Check the correct function and set-
tings of all regulation, control and safety
devices.
8.
Check the unit control system using the func-
tions described in the chapter "Operation".
Timer, temperature setting, fan speeds and
switching to ventilation or dehumidification
mode.
9.
Check the correct function of the condensate
drainage line by pouring distilled water into
the condensate tray. A bottle with a spout is
recommended for pouring the water into the
condensate tray.
10.
Switch the indoor unit to heating mode.
11.
During the test run, check the functionality of
all of the previously described safety devices.
12.
Record the measured values into the com-
missioning report and familiarise the operator
with the system.
13.
Remove the pressure gauge. Check that
seals have been fitted in the sealing caps.
14.
Re-install all disassembled parts.
11
Shutdown
Temporary shutdown
1.
Let the indoor unit run for 2 to 3 hours in
recirculation mode, or in cooling mode at
maximum temperature, to extract any
residual humidity from the unit.
2.
Shut down the system using the remote con-
trol.
3.
Switch off the electrical power supply to the
unit.
4.
Cover the unit as far as possible with plastic
foil in order to protect it from the influences of
weather.
Permanent shutdown
Ensure that units and components are disposed of
in accordance with local regulations, e.g. through
authorised disposal and recycling specialists or at
collection points.
REMKO GmbH & Co. KG or your contractual
partner will be pleased to provide a list of certified
firms in your area.
REMKO RVD series
52
Содержание RVD 1054 DC
Страница 67: ...Resistance values for probes T1 T2 T3 and T4 K Ohm K Ohm K Ohm K Ohm 67 ...
Страница 68: ...Resistance values for probe T5 K Ohm K Ohm K Ohm K Ohm REMKO RVD series 68 ...
Страница 83: ...No Designation 31 Shut off valve mounting plate 32 Condensate tray heating 33 Crankcase heating 83 ...
Страница 85: ...85 ...
Страница 86: ...REMKO RVD series 86 ...
Страница 87: ......