12
Shutdown
Temporary shutdown
Temporarily shutdown the plant as follows:
1.
If necessary, disconnect the electrical con-
nection of the flange heating cartridge at all
poles
2.
Drain the storage tank in areas where it is at
risk from frost and before the onset of winter
3.
After closing the shut-off valve in the cold
water supply, the domestic hot water is
drained through the drain valve in the cold
water inlet, which was installed by the cus-
tomer, while all of the hot water valves of the
service water fixtures are open. Partial
draining is also possible through the safety
valve in the expansion water funnel (drip
catcher). The safety valve is turned to the
"Test" position to do this.
CAUTION!
During drainage of the storage tank, hot water
may escape!
NOTICE!
When putting the storage tank back into
service, ensure that it is filled with water and
that water which is free of bubbles is escaping
from the valves!
Permanent shutdown
Ensure that units and components are disposed of
in accordance with local regulations, e.g. through
authorised disposal and recycling specialists or at
collection points. REMKO GmbH & Co. KG or your
contractual partner will be pleased to provide a list
of certified firms in your area.
REMKO storage tank systems
24
Содержание EWS 200 E
Страница 27: ......