background image

Media conveyed by the pumps

Grundfos pump

The pump is suitable for conveying the following

media:

n

Clean, thin, non-aggressive and non- explosive

media without any solid or long-fibred compo-

nents

n

Cooling liquids that are free of mineral oil

n

Soft water

The kinematic viscosity of water is ϑ = 1 mm2/s (1

cSt) at 20 °C. If the pump is used to convey liquids

that have a different viscosity, the conveying

capacity of the pump is reduced.

Example:

A water-glycol mixture with a 50 % glycol ratio has

a viscosity of approx. 10 mm2/s (10 cSt) at 20 °C.

This reduces the conveying capacity by approx.

15 %. Additives that could impair the functionality

of the pump must not be added to the water. The

viscosity of the conveyed medium must be taken

into consideration when designing the pump.

Wilo pump

The pump can be used to convey water- glycol

mixtures with a glycol ratio of up to 50 %. Example

of a water-glycol mixture:

Maximum permissible viscosity: 10 to 50 cSt. This

corresponds to a water-ethylene glycol mixture

with a glycol ratio of approx. 50 % at -10 °C. The

pump is controlled by a performance-limiting func-

tion that protects against overloading.

The conveyance of glycol mixtures has an impact

on the MAX characteristic curve because the con-

veying performance is reduced in line with the

glycol content and the temperature of the media.

Temperatures above the nominal temperature

specified for the medium in question should be

avoided so that the effect of the glycol is not dimin-

ished.

As a general rule, operating times should be kept

to a minimum if media temperatures are high. It is

essential that the plant be cleaned and rinsed

before adding the glycol mixture.

To prevent corrosion or precipitates, the glycol mix-

ture must be checked regularly and replaced if

necessary. If the glycol mixture needs to be

thinned out, follow the instructions of the glycol

manufacturer.

Installation

General notes

 NOTICE!

The 

EWS 200E

 storage tank may only be oper-

ated with the following REMKO heat pumps:

WKF 70, WKF 120, WKF 180

HTS 80, HTS 90, HTS 110,

HTS 130, HTS 200

 NOTICE!

Preparation of the hot water must be in compli-

ance with the applicable standards.

n

Do not continually top up the water level in the

storage tank. This will prevent corrosion

damage to the storage tank.

n

If corrosive water is a problem, please note

that special models of the storage tanks can be

tested. (Address all queries to your contractual

partner).

n

In hard water areas, connect a standard desca-

ling device upstream.

n

Drinking water quality is required to operate the

drinking water storage tank.

Units with electrically-operated flange heating

cartridges

If such units are equipped with a safety tempera-

ture limiter which stops heating the storage tank at

a temperature of max. 85 °C. The choice of con-

nection components (connecting pipes, circulation,

safety valve combination, etc.) must be such that,

in the event of a malfunction of the temperature

control, the connection components will withstand

temperatures of 85 °C, avoiding possible damage.

Domestic hot water-side connection (pressure-

tight)

Hot water heaters are pressure-tight storage tanks

with which pressure-tight connections can be

established. If the line pressure is higher than the

permissible operating pressure, a pressure

reducing valve provided by the customer must be

installed in the cold water supply. Only pressure-

tight fittings may be used.

The component-tested safety equipment must be

installed in the cold water line (see the following

diagram).

 

 

 

REMKO storage tank systems

 

 

18

Содержание EWS 200 E

Страница 1: ...Assembly and operating instructions Read the instructions prior to performing any task REMKO storage tank systems EWS 200E 300E 500E Storage tank for domestic hot water 0191 2018 08 Edition 1 en_GB...

Страница 2: ...g inal Read these operating instructions carefully before commis sioning using this device These instructions are an integral part of the system and must always be kept near or on the device Subject t...

Страница 3: ...8 Unauthorised modification and changes 5 1 9 Intended use 5 1 10 Warranty 5 1 11 Transportation and packaging 5 1 12 Environmental protection and recycling 6 2 Technical data 7 2 1 Unit data 7 2 2 Un...

Страница 4: ...tal or cause serious injury WARNING This combination of symbol and signal word warns of a potentially hazardous situation which if not avoided may be fatal or cause serious injury CAUTION This combina...

Страница 5: ...used in line with intended use in accordance with section 1 9 of the operating instructions Under no circumstances should the threshold values specified in the data sheet be exceeded Modifications or...

Страница 6: ...ollection points Disposal of equipment and components Only recyclable materials are used in the manufac ture of the devices and components Help protect the environment by ensuring that the devices or...

Страница 7: ...rgy efficiency ratio B B B Max installation length for flange heater mm 200 450 450 Height mm 1340 Tilt height mm 1455 1595 2023 Diameter mm 550 760 750 Weight kg 90 173 222 1 te 10 Tv 55 C Tm 45 C Q...

Страница 8: ...temperature C 60 60 60 60 Hot water temperature C 50 50 50 50 Cold water temperature C 10 10 10 10 Heating cycle flow rate l h 600 1200 1800 2400 Throughput kW Throughputs EWS 200E Preparation for do...

Страница 9: ...nlet temperature C 60 60 60 60 Hot water temperature C 50 50 50 50 Cold water temperature C 10 10 10 10 Heating cycle flow rate l h 600 1200 1800 2400 Throughput kW 18 7 28 1 33 7 37 0 Throughputs EWS...

Страница 10: ...E Preparation for domestic water Inlet temperature C 60 60 60 60 Hot water temperature C 50 50 50 50 Cold water temperature C 10 10 10 10 Heating cycle flow rate l h 600 1200 1800 2400 Throughput kW 2...

Страница 11: ...in mm 1 Magnesium anode 2 Venting 3 PU insulation 4 Probe sleeve 5 Sealing plug 6 Thermometer 7 Tilt height 8 Cleaning opening 9 Insertion dimension A Hot water B Inlet C Circulation D Return flow E C...

Страница 12: ...ot water B Inlet C Circulation D Return flow E Cold water Cold water hot water and circulation pipe are displayed rotated by 90 Hot water at the top circulation in the middle cold water at the bottom...

Страница 13: ...1 1 2 stopper fleece insulation cover cap 9 Membrane seal painted blank flange fleece insulation flange cover for DN110 10 1 1 4 stopper 11 Tilt height without storage tank cover 12 Name plate anode i...

Страница 14: ...UR insulation CFC HCFC and HFC free The storage tank is encased in a foil casing A blank flange cover is installed to retrofit a fine tube heat exchanger or a flange heating cartridge legionella prote...

Страница 15: ...contents of the packaging for com pleteness and check the unit for visible trans port damage Immediately notify your contract partner of any deficiencies n The storage tank may not be transported wit...

Страница 16: ...table for the requirements in accordance with VDI 2035 Part 1 with regard to total hard ness Total hardness dH subject to the specific system volume Overall output in kW 20 l kW 20 l kW and 50 l kW 5...

Страница 17: ...compliance is not covered by the guarantee Below you will find a suitable form for documenting the filling of the system Filling of heating system with completely deionised water Initial filling Year...

Страница 18: ...ure To prevent corrosion or precipitates the glycol mix ture must be checked regularly and replaced if necessary If the glycol mixture needs to be thinned out follow the instructions of the glycol man...

Страница 19: ...measuring device 6 Shut off valve 7 Safety valve with drainage line and funnel trap 8 Through flow diaphragm expansion vessel rec ommended if pressure fluctuations are antici pated on the domestic co...

Страница 20: ...e installation port Depending on the design of your system a flange heating cartridge or a fine tube heat exchanger can be installed on the flange that is present n Install the flange heating cartridg...

Страница 21: ...ter tank must be filled with water before being put into service n A mains connection must be installed and appropriately fused according to the circuit dia gram affixed in the terminal box for the un...

Страница 22: ...personnel and documented after the certificate has been issued 1 Check all connections even those which were sealed at the factory flange anode sleeve for leak tightness 2 Then check all pipes for any...

Страница 23: ...pressure in the water pipe is higher than permitted a pressure relief valve must be used In hard water areas the limescale which forms inside the storage tank must be removed by a spe cialist after o...

Страница 24: ...en Partial draining is also possible through the safety valve in the expansion water funnel drip catcher The safety valve is turned to the Test position to do this CAUTION During drainage of the stora...

Страница 25: ...chnical development process Spare parts list No Designation EWS 200E EWS 300E EWS 500E EDP no 1 Fine tube heat exchanger 260200 260200 2 Flange heating cartridge 260160 260160 260160 3 Immersion probe...

Страница 26: ...7 Ordering spare parts 25 S Safety Dangers of failure to observe the safety notes 4 General 4 Identification of notes 4 Instructions for the operator 5 Note for inspection work 5 Note for installatio...

Страница 27: ......

Страница 28: ...t as advisers to our customers in air conditioning and heating technology SFlbCustomer Service Our equipment operates precisely and reliably However in the event of a fault REMKO customer service is q...

Отзывы: