REMKO ETF 360 Скачать руководство пользователя страница 15

15

The units are designed exclusively 
for drying and dehumidification 
purposes on the basis of their 
structural design and equipment.
The units must not be used for any 
other purpose. 

The units are only permitted 
to be operated by people 
with the relevant training and 
understanding of how to handle 
them. 

The manufacturer shall not 
be liable for damage resulting 
from non-observance of the 
manufacturer's specifications, the 
respective local legal requirements 
or from arbitrary alterations to the 
units.

Customer service and 
guarantee

As a prerequisite for any guarantee 
claims to be considered, it is 
essential that the ordering party 
or its representative complete 
and return the 

“Certificate of 

guarantee”

 to REMKO GmbH & 

Co. KG at the time when the units 
are purchased and commissioned. 

The units were tested at the factory 
several times to verify their correct 
function.  
However, if malfunctions should 
arise that cannot be remedied by 
the operator with the assistance of 
the troubleshooting section, please 
contact your specialist dealer or 
contractual partner.

intended use

Disposal of packaging

When disposing of packaging 
material, please consider our 
environment. 
Our units are carefully packed 
and delivered in stable transport 
packaging and, if applicable, on 
a wooden pallet.  
The packaging materials are 
environmentally-friendly and can 
be recycled.
By recycling packaging materials, 
you make a valuable contribution 
to the reduction of waste and 
conservation of raw materials.

Therefore, only dispose of 
packaging material at appropriate 
collection points.

Environmental 
protection and 
recycling

Disposal of the old unit

At the end of its service life, 
this unit is not permitted to be 
disposed of in household waste. 
It must be taken to a special 
collection point for electrical and 
electronic units.
The materials are recyclable 
according to their labels.

By reusing, recycling substances 
or other forms of recycling for 
used devices, you make a valuable 
contribution to protecting our 
environment.

Please contact your local authority 
for information on the disposal 
facility responsible.

Important information 
concerning recycling

The units are operated with 
environmentally-friendly and 
ozone-neutral R410A refrigerant.

The mixture of refrigerant and oil 
within the unit must be disposed 
of properly in accordance with 
the statutory or locally-applicable 
regulations.

Copyright

Redistribution, even in part, 
or use of this documentation 
for purposes other than 
intended without the written 
authorisation of

REMKO GmbH & Co. KG

is prohibited.

CAuTiOn

!

Repair and maintenance 
work may only be carried out 
by authorised and qualified 
technicians.

nOTE

Operation that differs from 
that specified in this operating 
manual is prohibited.
With non-observance, any 
manufacturer liability or 
guarantee claims are voided.

nOTE

Содержание ETF 360

Страница 1: ...Edition GB N01 REMKO ETF 360 ETF 460 Mobile dehumidifiers Operation Technology Spare parts...

Страница 2: ......

Страница 3: ...the unit itself Subject to modifications no liability accepted for errors or misprints Air dehumidification 4 6 Safety notes 6 Unit description 7 Set up 8 Commissioning 8 11 Shutdown 11 Unit transpor...

Страница 4: ...vapour released from parts of a building or materials is absorbed by the surrounding air As a result the moisture content increases which ultimately gives rise to corrosion mould rot peeling of paint...

Страница 5: ...he temperature to fall below it Building materials and structures are capable of absorbing considerable volumes of water such as brick 90 190 l m heavy concrete 140 190 l m and limestone 180 270 l m T...

Страница 6: ...of the unit but is determined to a greater extent by the speed at which the material or building section loses its moisture The units have been subjected to extensive material functional and quality...

Страница 7: ...inserted Dehumidification mode then starts after a switch on delay of around 3 minutes depending on the requirements In unattended continuous operation with an external condensate connection the cond...

Страница 8: ...elative humidity and observance of the set up instructions Wall clearance min 0 5 m Maintain adequate clearance from heaters or other sources of heat Keep windows and doors closed Schematic depiction...

Страница 9: ...dual current device provided by the customer in accordance with the regulations Note In room temperatures below 10 C and relative humidity below 40 economical use of the unit can no longer be guarante...

Страница 10: ...FF switching functions for up to 24 hours in 1 hour cycles Timer switching functions Setting in running operation After the selected number of hours the unit switches OFF Setting if the unit is switch...

Страница 11: ...that the drainage hose is placed at an incline to the drain to allow the condensate to drain without hindrance Caution After you plug in the adapters SA the pump is immediately ready for operation an...

Страница 12: ...ontamination on a regular basis Clean or replace if required Care and maintenance Regular care and maintenance is fundamental to a long service life and fault free operation of the unit Cleaning the c...

Страница 13: ...ay be remedied by washing the filter F in a lukewarm max 40 C soap solution Finally always rinse the filter carefully with clear water and allow to dry 7 Also check the intake grill G for contaminatio...

Страница 14: ...specially authorised specialist Caution The unit is loud or condensate runs out Check whether the unit is on a stable and even base Check whether the unit is standing upright and stably Have the conde...

Страница 15: ...re environmentally friendly and can be recycled By recycling packaging materials you make a valuable contribution to the reduction of waste and conservation of raw materials Therefore only dispose of...

Страница 16: ...it We reserve the right to modify the dimensions and design as part of the ongoing technical development process 46 36 35 43 42 41 39 44 45 37 06 03 01 08 02 02 04 05 02 18 19 28 31 20 17 16 15 29 32...

Страница 17: ...111865 1111865 17 Fan motor 1111866 1111866 18 Fan support plate 1111867 1111867 19 Support plate top 1111868 1111868 20 Exhaust grille 1111869 1111869 22 Fin condenser 1111870 1111870 23 Fin vaporise...

Страница 18: ...leaned Fan function checked Air inlet grid with filter cleaned Unit checked for damage Safety devices checked All fastening screws checked Electrical safety check Test run 1 Date Signature 2 Date Sign...

Страница 19: ...es Max min airflow volume m3 h 320 280 310 270 Condensate container capacity l 6 5 6 5 Condensate pump Built in Built in Hose length condensate pump m 5 10 5 10 Delivery height condensate pump m 5 5 R...

Страница 20: ...more than just an excellent reliable supplier REMKO a partner who helps to solve problems Sales REMKO offers not just a well established sales network both nationally and internationally but also has...

Отзывы: