Green House Manual
Page | 21
5.
You will now start installing your track on your front and back bow frame pipes and your inwall
pipes cutting the track and fitting it to size. Follow the red arrows below to pinpoint where your
track should go.
Your track will only go on the cross pipe that hovers over the door as shown
below.
6.
You will then install the tracks on both sidewall eaves that you installed earlier on your base
purlins. The tracks will go on the top short part of the eave for both side walls.
Base purlin
Poly track