Green House Manual
Page | 20
Once your front and back wall base trim is installed you will remove your batter boards from each
corner of your frame.
Installing your poly track
1.
You will now install your poly track on the front
and back wall base trim. You will have to cut it to
length to fit properly. The poly track will go right at
the top edge of your trim.
2.
Use the 5/16 tech screws and screw them down
at each end of your poly track through the inwall
pipe then proceed to secure the track in 12-inch
increments in between.
3.
Repeat this process on the other side of the door.
4.
You will also do this for your back wall but remember since there is no door on your back wall
you will install the poly track all across the base trim
NOT THE CROSS PIPES.
5/16 tech screw
Batter boards
Poly track over your base trim