7
2 CONSTRUCTION
2.1 Boiler layout
0
bar
1
2
4
3
Fig. 01 Boiler layout Remeha Quinta 30 and boiler layout with optional 3-way valve
04.W3H.79.00003 + 04.W3H.79.00011
1. Air supply fan.
2. Pre-mix burner
3. Combined ignition/ionisation probe
4. Sight glass
5. Gas combi-block (with governor)
6. Cast aluminium heat exchanger
7. Temperature sensor-return
8. Facility for incorporating a
rematic
®
weather compensated boiler control
9. Siphon
10. Hoses automatic air vent and
condensate
11. Flue gas measure point
12. Automatic air vent
13. Gas injector/venturi
14. Temperature sensor-flow
15. Air inlet tube
16. Heat exchanger inspection cover
17. Pressure gauge
18. Control panel
19. Optional 3-way valve
20. DHW primary flow connection (when
optional 3-way valve is fitted)
0
bar
1
2
4
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
20
57117.indd 7
57117.indd 7
1-4-2009 14:35:49
1-4-2009 14:35:49