
5 Installation
5.1
Installation regulations
Caution
The appliance must be installed and maintained by a certified
professional in accordance with prevailing statutory texts and
codes of practice.
5.2
Unpack and fit the control box
Caution
Wear gloves when handling the control box.
1. Cut and remove the packaging.
Important
The technical documentation is housed in the protective block.
2. Remove the two screws from the boiler's rear top panel.
3. Lift the top panel.
4. Remove the top panel.
Fig.9
MW-6000750-02
M
an
ual
1
Fig.10
MW-6000760-01
3
4
2
2
5 Installation
18
MID _HMI T-control - Gas 120 ACE
7717201 - v03 - 25062019