Reliance electric MinPak Plus Скачать руководство пользователя страница 24

23

TABLE 5.A - TROUBLESHOOTING SUGGESTIONS FOR THE

THREE PHASE MINPAK PLUS CONTROLLER

Symptom

Probable Cause

Recommended Procedures

1. POWER ON/OFF

circuit breaker

trips or fuses clear

when power is apĆ

plied.

Incorrect wiring conĆ

nections to controller;

from controller to moĆ

tor; in motor.

Remove aĆc power at the disconnect.

Remove leads to L1, L2, L3, A1, A2 and F1, F2, on

incoming

side of controller's

respective location.

Open the power disconnect switch.

Check for a ground condition at 51, 52, 53, A1, A2, F1 and F2. Do this internal to

controller. If a ground is discovered, check wiring connections on Power Cube and

motor field terminals F1 and F2.

If no ground exists, examine the controller chassis for loose wires and/or foreign

objects.

If no ground exists and if no foreign objects are discovered, reconnect the incoming

conductors A1, A2 and F1 and F2. Then check for grounds at these terminals.

If a ground is found, it is in the conductors to the motor or in the motor itself.

Disconnect the motor from the conductors at the drive motor.

Test A1, A2, F1 and F2 conductors for a ground. (If one exists, examine connections

and insulation for areas where shorts could occur.)

If no grounds are found in the conductors, check the motor for a ground condition. If

a ground is located here, examine and/or replace the motor, as necessary.

Short in Power Cube.

Replace Power Cube.

Short in Field Supply.

Replace Field Supply.

2. Drive motor does

not start.

Main aĆc line disconĆ

nect not closed; or

fuse blown; or no

power applied ahead

of disconnect.

Check disconnect switch, fuses in it, and voltage on line.

Drive interlocks preĆ

venting operation. 32

to 33 on TB

Verify that all userĆinstalled interlocks are in a state (physical condition and wiring

connections) to allow a start.

Drive motor thermoĆ

stat wires not conĆ

nected on MinPak

Plus controller termiĆ

nals 34 and 132 on

TB.

Check connections to thermostat: at drive motor P1, P2; at controller 34, 132.

Check for open thermostat inside motor. Make a resistance check of thermostat. (It

should read a short, or low resistance, if it is closed.

External overload

wires not connected

on MinPak Plus conĆ

troller terminals 34

and 33 on TB.

Check connections to external overload. (Blower Motor Starter O/L)

Check for open overload, Make a resistance check to overload. (It should read a

short, or low resistance, if it is closed.)

Drive thermostat wires

not connected on

MinPak Plus controller

terminals 132 to 232

Check connections to thermostat at drive power bridge heat sink, at controller 132 or

232.

Check for open thermostat. Make a resistance check to the thermostat. (It should

read a short, or low resistance, if it is closed.

3. Remote or Local

Operator Control

Station functions

not operating.

Malfunctioning

switches.

Check START/STOP switch, but

first

remove aĆc line power at main disconnect.

Connect ohmmeter to terminal 32 (red) pin on the switch. (Note numbers here refer to

numbers noted on Remote Station wiring diagram at Figure 3.8.

Touch probe to wire 38 (brown) pin on the switch.

Place switch in the START (closed) position,

If the switch is property functioning, a short will be seen on the meter.

Check the STOP function. Place the RUN/JOG switch in the RUN position. Connect

the ohmmeter to terminals 32 (red) and 35 (orange). Place the switch in the STOP

position, which should open it if it is functioning correctly. If there is a short, it will be

seen on the meter. If there is no short, the circuit is opened, and the switch is

functioning correctly.

Using similar techniques, test the RUN/JOG switch. The pins are 35 (orange) and 32

(red). When the switch is in the RUN position, a short should be read.

Improper wiring conĆ

nections.

For a Remote Operator Control Station, compare actual wiring with Figure 3.4. A

Local Operator Control Station uses 2 cable harnesses, so wiring should not be a

problem. However, check the pin connectors on the Regulator Module for proper

fitting.

DANGER

IF CIRCUIT BREAKER HAS TRIPPED OR FUSES HAVE CLEARED,THE FIELD

SUPPLY AND ITS WIRING MUST BE INSPECTED FOR DAMAGE. AFTER

REĆAPPLYING POWER TO THE DRIVE, THE FIELD VOLTAGE MUST BE

REĆCHECKED FOR PROPER VOLTAGE AT MOTOR TERMINALS F1, F2. IF

THIS VOLTAGE IS BELOW 90% OF THE FIELD VOLTAGE SPECIFIED ON THE

MOTOR NAMEPLATE, THE DRIVE MUST NOT BE STARTED UNTIL PROPER

VOLTAGE IS OBTAINED. FAILURE TO FOLLOW THIS PROCEDURE COULD

RESULT IN OVERSPEEDING THE MOTOR AND/OR THE MACHINERY

COUPLED TO THE MOTOR SHAFT AND POSSIBLE FATAL INJURY.

Содержание MinPak Plus

Страница 1: ......

Страница 2: ...AR WITH THE CONSTRUCTION AND OP ERATION OF ALL EQUIPMENT IN THE SYSTEM PERSONAL INJURY AND OR EQUIPMENT DAMAGE MAY OCCUR IF INDIVIDUALS ARE NOT FAMILIAR WITH THE HAZARDS RESULT ING FROM IMPROPER OPERA...

Страница 3: ......

Страница 4: ...ation Kits conveniently expand the ca pability of the three phase Minpak Plus The controller s features are summarized in Table 2 A For proper op eration of the Minpak Plus controller it is necessary...

Страница 5: ...bility of the controller can be quickly and conveniently extended withtheuseofavarietyofoptionalModificationKits The Basic Controller modifications are Tachometer Feedback Voltage Tachometer Follower...

Страница 6: ...speed Adjustable minimum speed 5 to 30 of base motor speed Adjustable current limit 10 to 150 of full load current Adjustable separately set linear acceleration and deceleration rates 0 5 to 30 sec Sa...

Страница 7: ...up to 100 of base speed Operator Torque Adjustment Infinitely adjustable at optional control pot 10 to 150 of rated load IR Drop Compensation 0 to 12 of rated load user adjustable Controllable Speed R...

Страница 8: ...5000 5000 30 50 63 80 115 145 6 10 12 1 2 16 23 30 14C313 25 30 460 460 40 47 500 500 43 51 300 300 5 5 5000 5000 175 205 35 41 30 40 460 460 47 63 500 500 51 69 300 300 5 5 5000 5000 205 250 41 55 Be...

Страница 9: ......

Страница 10: ...THAT PROVIDES EI THER 230 VAC OR 460 VAC AT 60 HZ OR 220 VAC OR 440 VAC AT 50 HZ IF CORRECT VOLTAGE IS NOT AVAILABLE IT WILL BE NECESSARY TO INSTALL A TRANSFORMER BETWEEN THE POWER SUPPLY AND THE CON...

Страница 11: ...t will be necessary to install a transformer between the power supply and the controller WARNING DO NOT OPERATE THE MINPAK PLUS CON TROLLER ON POWER SUPPLIES WITH AVAIL ABLE SHORT CIRCUIT CURRENTS IN...

Страница 12: ...cribe the panel Drill three holes large enough to ac cept 10 mounting bolts Scrape the paint around the holes to allow washers and bolts to make a ground con tact Choose four 3 8 inch lug bolts The le...

Страница 13: ......

Страница 14: ...0 15 5 7 10 13 19 27 15 54 20 36 20 72 25 30 40 45 54 72 High HP units cannot be directly scaled to the lower HP units above line due to current transformers ratios used in feedback loop Step 3 On the...

Страница 15: ...nd the driven process itself may be subjected to operating speeds well in excess of normal rated speeds As such the fol lowing considerations are necessary All Reliance Electric Drive packages manufac...

Страница 16: ...USER CONVENIENCE BLANK TERMINALS Figure 3 6 Remote Operator s Buffer Terminal Markings HP SCALING PINS Figure 3 7 Regulator Module HP Current Scaling Pins...

Страница 17: ......

Страница 18: ...associated units The purpose of this check is to look for possible physical damage or im proper connections Inspect all plug in Modification Kits Test each for a firm mounting condition Each should b...

Страница 19: ...ead from the ohmmeter to the mo tor frame to make a simple resistance check Touch the test probe to each of the two power two thermostat and two field leads to the motor If the reading to ground on an...

Страница 20: ...NJURY 4 3 1 Regulator Module Pots The Regulator Module has six adjustable potentiometers mounted on it Refer to Figure 4 4 They control the following functions Maximum speed full CCW 50 70 speed Minim...

Страница 21: ...the motor speed can be determined with a tachometer With the SPEED dial at zero position and using a small insulated slot screwdriver carefully turn the Minimum Speed Potentiometer until the desired...

Страница 22: ...operating condi tions of these modules It also has the ability to analyze the power bridge circuitry while the drive is operating and determine if a problem exists within the power bridge area The dia...

Страница 23: ...est points It may be that the malfunction is a simple mechanical problem The load on the drive motor may be too large or it may have too high an iner tia The results are long stopping times and curren...

Страница 24: ...Pak Plus con troller terminals 34 and 33 on TB Check connections to external overload Blower Motor Starter O L Check for open overload Make a resistance check to overload It should read a short or low...

Страница 25: ...served remove jumper J9 and repeat the test If a 150 to 1000 ohms resistance reading cannot be obtained when the switches are open the M contactor is malfunctioning and must be replaced 6 M contactor...

Страница 26: ...he START STOP switch in the START position Increase the speed reference by turning the SPEED dial in the direction of 10 The reading across 47 and 45 it may be 0 to 240 VDC for 230 VAC controllers It...

Страница 27: ...ook to see if SCR is switching if not replace power cube Repeat for 51 45 52 47 52 45 53 8 47 53 45 if necessary 10 Remote Operator Control Station functions not op erating Malfunctioning switches Che...

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ...Figure 5 9 230 VAC Auxiliary Panel Assembly Schematics...

Страница 33: ...Figure 5 10 460 VAC Auxilliary Panel Assembly Schematics...

Страница 34: ......

Страница 35: ......

Страница 36: ......

Страница 37: ......

Страница 38: ......

Страница 39: ...Figure 5 13B Technical Data 230 VAC Three Phase MinPak Plus...

Страница 40: ......

Страница 41: ...Figure 5 14B Technical Data 460 VAC Three Phase MinPak Plus...

Страница 42: ......

Страница 43: ......

Страница 44: ......

Страница 45: ......

Страница 46: ...V Surge Suppressor 3 20 HP 230 VAC 3 40 HP 460 VAC DV DT PC Card 3 20 HP 230 VAC 3 40 HP 460 VAC DV DT Resistor Assembly 3 40 HP 460 VAC Incoming Line Circuit Breaker 3 10 HP 230 VAC 15 20 HP 460 VAC...

Страница 47: ...VAC 3 to 40 HP 460 VAC 15 20 HP 230 VAC 20 40 HP 460 VAC 1FU 2FU 3 1 1 1 1 1 1 1 1 1 2 14C671 14C665 14C666 14C667 14C220 14C672 14C673 14C674 14C669 14C669 14C675 64676 23V 411027 70S 411027 68S 4110...

Страница 48: ...ing holes in the Modules that form part of the Kit Refer to Figure 7 1 Figure 7 1 Pin Alignment A common installation problem is caused by bent broken or incorrectly placed pins Sinceimproper op erati...

Страница 49: ...ne Wire Dancer Follower D 3966 14C230 Yes Yes Dancer Potentiometer Wire Instrument Interface Preset Speed D 3967 14C222 Yes No Yes No Yes If Preset Speed only may need Auto Manual Switch If follows pr...

Страница 50: ...k Instrument Interface Voltage Tachometer Follower Three conductor Twisted with two twists per inch Two conductor Twisted pair with two twists per inch Stranded copper 19 x 29 AWG No 16 600 VAC rating...

Страница 51: ......

Страница 52: ...nsformers 11 3 5 HP Current Jumper 13 3 6 Regulation Mode Jumper 13 3 7 Overspeed 14 SECTION 4 START UP AND ADJUSTMENT 17 4 0 General 17 4 1 Power Off Inspection 17 4 2 Motor Ground Check 18 4 3 Power...

Страница 53: ...Page TABLE OF CONTENTS ii 7 0 General 47...

Страница 54: ...tor Module 26 Figure 5 4 Digital Driver Module 27 Figure 5 5 Local Station Connection Diagram 27 Figure 5 6 230 VAC Controller Power Bridge Schematic 28 Figure 5 7 460 VAC Controller Power Bridge Sche...

Страница 55: ...OTING SUGGESTIONS FOR THE THREE PHASE MINPAK PLUS CONTROLLER 23 TABLE 5 A TROUBLESHOOTING SUGGESTIONS FOR THE THREE PHASE MINPAK PLUS CONTROLLER Continued 24 TABLE 5 A TROUBLESHOOTING SUGGESTIONS FOR...

Отзывы: