10
10
USER MANUAL
Maintenance Programme
Daiy Maintenance
Machines with air fitler, should be cleaned
daily. The cleaning should be made with high
pressure water or high pressure air.
Monthly Maintenance
Remove the air input fitler and clean the
aluminium surfaces with high pressure water
or vacuum cleaner.
Annual Maintenance
The annual maintenance should be made by
an authorized technician. The heatexchangers
should be removed and cleaned.
Note:
The mainetenance intervals may vary
depending on the pollution rate.
“Beware of sharp parts while cleaning.”
“Wear Safety Gloves!”
Содержание RM55000
Страница 14: ...14 14 USER MANUAL Cables Ground N Neutral L1 1 Phase L2 2 Phase L3 3 Phase Fan Kablosu N Neutral L1 Phase...
Страница 15: ...15 15 USER MANUAL Cable Connections for additonal Fans Connecting cables L1 Brown cable N4 Blue cable...
Страница 17: ...17 17 USER MANUAL Removable Parts Air Sealing Parts...
Страница 18: ...18 18 USER MANUAL Technical Drawings...
Страница 19: ...19 19 USER MANUAL Technical Drawings...
Страница 20: ...20 20 USER MANUAL...
Страница 21: ...21 21 USER MANUAL...
Страница 22: ...22 22 USER MANUAL...
Страница 23: ...23 23 USER MANUAL...
Страница 24: ...24 24 USER MANUAL...