background image

 

 

5

 

USER MANUAL 

Pre Usage Inspection Process

 

 

Basic Item 

A  Pre-Usage  Inspection,  is  a  visual  control  made  by  the  operator  before 
operating  the  Dryer.  Please  check  each  item  the  list  next  page.  In  case  of  any 
changes  comparing  to  factory  defaults  and  /  or  defect  caused  by  producer, 
make sure that the Dryer will not be operated.   

It is cleary mentioned in this user manual, that the repairment of the Dryer 
should be made only by qualified technicians. After the repairment, the 
operator should make the routine pre-operationg inspections. 

 

Pre-Usage Inspection Process

 

Make sure that the whole user manual is always readable and fully available. 
Make sure that all security tags are in its place as shown in the tag section. 

Please check following items for damage, improper installation or missing parts 
and check if anything is changed. 

 

1.

 

Make sure that alla removable parts ar in its place 

2.

 

make sure that the Power Cord is plugged in 

3.

 

Open the air output vent with the lever. Leave at least 50cm space for the 
suction input and blow output. 

4.

 

Fix the dryer on a plain ground. 

 

 

 

Содержание RM55000

Страница 1: ...MAK NA Index Foreword Warning sings Safety rules Operating Instructions Pre Operation Inspection Install and transport Usage and Storage Working Life Time and Noice Declaration Technical Specificatio...

Страница 2: ...MANUAL Warring Sings Please avoid contact with liquids Do not run the Dryer with peeled cables Avoid Cable Jams Do not approach with sharp and spike materials Ror Repair and Maintenance C all Technica...

Страница 3: ...rk purpose Please follow all instructions in the user manual as well as all signs on the Dryer Please study the Dryer for safety opearation Electrical Shock Hazard This Dryer has no electric isolation...

Страница 4: ...ose metioned herein If the Dryer is used by more than one operator each operator has to follow all instrucitons before operationg the Dryer always make safety necessary inspections Always make a funct...

Страница 5: ...echnicians After the repairment the operator should make the routine pre operationg inspections Pre Usage Inspection Process Make sure that the whole user manual is always readable and fully available...

Страница 6: ...rting on a plain ground After unlocking the wheels you can move the Dryer via transportation handle 2 Moving Transporting on a uneven ground Make security precaution and lift the Dryer on its big whee...

Страница 7: ...emely hot metal surfaces can be released toxic and corrosive products The steam of it is heavier than oxygene and reduces oxygene in the air Inhaling freon gas can cause heart irregularities conscious...

Страница 8: ...32 000 hours 2 Fan Engine When working life has of a spare part is over it should be replaced with a new one in order to make the Dryer work again Note Sparepart replacement should only be done by an...

Страница 9: ...0 Hz 414 506 V 3 60 Hz Effective area heated 100 m 100 m Effective area non heated 2000 m 2000 m Dry air output 18 rh 18 rh Air Flow Dry Air Flow 1800 m h 1800 m h Warm Air Flow 3500 m h 3500 m h Tota...

Страница 10: ...thly Maintenance Remove the air input fitler and clean the aluminium surfaces with high pressure water or vacuum cleaner Annual Maintenance The annual maintenance should be made by an authorized techn...

Страница 11: ...tion switch is switched off and the electrical cuircut has been interrupted To re operate the Heat Pump turn the switch to position 1 3 The Contactor is used to transfer power 4 If the Gren Led On the...

Страница 12: ...uld not be bigger than 100m For Rooms with more than 100m a second dryer is required The volume of the room depends on the ceiling heigt The ceiling should not be higher than 2 5m For Example A room w...

Страница 13: ...he purpose is to balance the heat in the room Isolation When preparing a drying room the inside of the room should be isolated Drying Process takes more time in a Room without isolation Less Heat Loss...

Страница 14: ...14 14 USER MANUAL Cables Ground N Neutral L1 1 Phase L2 2 Phase L3 3 Phase Fan Kablosu N Neutral L1 Phase...

Страница 15: ...15 15 USER MANUAL Cable Connections for additonal Fans Connecting cables L1 Brown cable N4 Blue cable...

Страница 16: ...ryer during the remove process Unpulg the the macine if pugged in Things to do when removing parts Remove the screws the held the parts together Remove the parts in the order shown below To re attach...

Страница 17: ...17 17 USER MANUAL Removable Parts Air Sealing Parts...

Страница 18: ...18 18 USER MANUAL Technical Drawings...

Страница 19: ...19 19 USER MANUAL Technical Drawings...

Страница 20: ...20 20 USER MANUAL...

Страница 21: ...21 21 USER MANUAL...

Страница 22: ...22 22 USER MANUAL...

Страница 23: ...23 23 USER MANUAL...

Страница 24: ...24 24 USER MANUAL...

Отзывы: