Inspection Prior to Initial Operation

Each product must be inspected prior to initial 

operation by a competent person to ensure that the 

structure is safe and that it has not been damaged 

by incorrect assembly, transport or storage. 

Inspection Before Starting Work

Before starting work, the product assembly and 
all load-bearing components should be checked 
for visual defects as per the inspection checklist on 
page 16.

Maximum Capacity

Goods Lifting: 

This product is designed to lift and 

lower loads up to its rated capacity. Do not exceed 
the capacity indicated on the system.  

Personnel Lifting:

 When lifting people, the overall 

load limit is reduced by half to provide an increased 
safety factor.  The maximum capacity permitted by 
the personnel winch/accessory used in conjunction 
with the product also needs to be considered.

Please refer to the tables for information on 
capacities and required amounts of counterweight.  
The capabilities and counterweight stated in the 
tables apply to standard range systems only. If you 
are unsure about the system, consult the serial labels 
information on page 31 or consult your supplier.

Temperature Range

This product can be operated in ambient dry 
temperatures between –20°C and +55°C (-4°F 
and 131°F). Consult your supplier in case of 
extreme working conditions. If used in sub-
zero and wet conditions, fall arrest appliances 
characteristics may change.

PORTABASE Maximum Capacity [kg]

Max Radius 

800mm

1000mm

1200mm 

Part Code 

Description 

Goods  

Lifting 

Personnel 

Lifting

Goods  

Lifting

Personnel 

Lifting

Goods  

Lifting 

Personnel

 Lifting 

PBHB00001

H Base

600kg

300kg

x

x

x

x

PBCB00001

Counterbalance

600kg

300kg

500kg

250kg

400kg

200kg

For fall protection applictions see page 8.

Содержание PORTABASE PBCB00001

Страница 1: ...REIDLIFTING COM PORTABASE Assembly Operation Guide...

Страница 2: ...eration Warning IRATA Inspection Maintenance 16 Regular Inspections Maintenance Repair Storage Transportation ATEX 18 ATEX Classification Zone 2 Spark Formation Static Electricity Inspection Maintenan...

Страница 3: ...and cleaning Maintenance inspection and repair Transportation It is the responsibility of the end user to adhere to the Health Safety and accident prevention standards and legislation valid in their r...

Страница 4: ...uct is of no relevance to fall protection standards and requirements and the user should refer to the specific sections of the instructions for use for detailed information For example EN795 requires...

Страница 5: ...ch accessory used in conjunction with the product also needs to be considered Please refer to the tables for information on capacities and required amounts of counterweight The capabilities and counte...

Страница 6: ...g should only be carried out when the load chain forms a straight and vertical line between the load and lifting attachment point Only use this product when all leveling feet have been deployed and le...

Страница 7: ...nces remove any weights from the basket during a lift Only applicable to the counterbalance system Allowable Rotation H Base The operating radius for the H Base is within the inside of the legs of the...

Страница 8: ...versions are designated with a C at the end the product number on the serial label attached to each product Additional Notes for Correct Operation Warnings Always carry out pre use checks before using...

Страница 9: ...west rated piece of equipment in the fall arrest system Ensure that you have read and understood the maximum force tables for each anchor point on the corresponding davit selected to be used with the...

Страница 10: ...T Type S Davit Radius Anchor Point A Anchor Point B Anchor Point C Porta Base Fixed Socket 800 mm 22 2 kN 22 2 kN 22 2 kN 1000 mm 16 kN 16 kN 22 2 kN 1200 mm 16 kN 16 kN 22 2 kN Fixed Socket Only 1600...

Страница 11: ...Point A Anchor Point B Anchor Point C Anchor Point D Porta Base Fixed Socket 800 mm 22 2 kN 22 2 kN 22 2 kN 22 2 kN 1000 mm 16 kN 16 kN 16 kN 22 2 kN 1200 mm 16 kN 16 kN 16 kN 22 2 kN Fixed Socket Onl...

Страница 12: ...IT Type DW Davit Radius Anchor Point A Anchor Point B Anchor Point C Porta Base Fixed Socket 800 mm 22 2 kN 22 2 kN 22 2 kN 1000 mm 16 kN 16 kN 16 kN 1200 mm 16 kN 16 kN 16 kN Fixed Socket Only 1600 m...

Страница 13: ...uced Radius PDQRW Davit Radius Anchor Point A Anchor Point B Anchor Point C 800 mm 16 kN 16 kN 16 kN This product was developed for the PORTABASE range including H Base and Counterbalance where the re...

Страница 14: ...adius Anchor Point A Anchor Point B Anchor Point C P1 1000 mm 15 kN 15 kN 15 kN P2 1100 mm 15 kN 15 kN 15 kN P3 1200 mm 15 kN 15 kN 15 kN This product is designed for fixed sockets or with the PORTABA...

Страница 15: ...sition Davit Radius Anchor Point A Anchor Point B Anchor Point C P1 1300 mm 12 kN 12 kN 12 kN P2 1400 mm 12 kN 12 kN 12 kN P3 1500 mm 12 kN 12 kN 12 kN This product is designed for fixed sockets or wi...

Страница 16: ...Davit is fully engaged in the hub before applying a load Check the Davit in accordance with its corresponding Assembly Operation Guide Only applicable to the counterbalance system Inspections are inst...

Страница 17: ...sent of the manufacturer Any necessary repairs identified during inspections should only be carried out by an approved specialist workshop using original spare parts Any repair must be carried out in...

Страница 18: ...mists or by air and dusts mixtures are unlikely to occur or if they do occur are likely to do so only infrequently and for a short period only If the product is suitable for use in this environment it...

Страница 19: ...hat could create electrostatic charging The structure is predominantly constructed from aluminium which will not rust However there are steel components used throughout Where there is sign of any rust...

Страница 20: ...se system will be delivered in three components which are the Left Leg Assembly Right Leg Assembly and Central Hub Appropriate PPE should be worn Gloves Protective Footwear Hard Hat Assembly Instructi...

Страница 21: ...ctions and secure them into position with the R clips provided Insert the Davit into the Central Hub for use NB Please refer to the Assembly Operation Guide of the applicable Davit system when used in...

Страница 22: ...ystem will be delivered in five components which are the Left Leg Assembly Right Leg Assembly Central Hub Tail and Basket Appropriate PPE should be worn Gloves Protective Footwear Hard Hat Assembly In...

Страница 23: ...ded Repeat steps 1 and 2 for the second Leg Assembly securing the Leg Assembly to the Central Hub Insert the first Leg Assembly into the Central Hub Remove the pins from each side to unfold the basket...

Страница 24: ...side plate between the end plate channels Ensure the side plate sits correctly over the pin Secure in place with the pins Repeat steps 7 10 for the second side plate Attach the basket to the tail and...

Страница 25: ...of the Leveling Feet Insert the Davit into the Central Hub for use NB Please refer to the Assembly Operation Guide of the applicable Davit system when used in conjunction with the PORTA BASE 25 PORTAB...

Страница 26: ...Variants Options...

Страница 27: ...e height adjustment legs fully retracted as shown in figure 2 Position the system in place for the lift before setting the height Manually raise each leg in turn and set the height by rotating the han...

Страница 28: ...Dimensions 332 450 1150 1600 1830 Max 1430 Min 115 mm Height Adjustment PORTABASE H Base...

Страница 29: ...29 PORTABASE PORTABASE Counterbalance 2720 Max 2320 Min 2415 962 1950 240 140 320 638 600 92mm Height Adjustment...

Страница 30: ...ombining quality systems management environmental issues and the health and safety practices within the company ISO 9001 2015 Quality management system which assesses an organization s ability to cons...

Страница 31: ...ght portable and safe lifting solutions Innovation category 2006 and 2013 International Trade 2013 and 2018 Testing Testing and technical file review are integral parts of our design and manufacturing...

Страница 32: ...Product labelling The following labels must be present on the product and must be legible 1 2 3 4 5 4 4 5 5 4 2 1 3 2 3 2 3 6 6 6 Product Labelling PORTABASE H Base...

Страница 33: ...Product labelling The following labels must be present on the product and must be legible 1 2 3 4 5 4 4 4 5 5 5 5 6 2 1 3 6 6 6 3 3 2 2 3 3 33 PORTABASE PORTABASE Counterbalance...

Страница 34: ...Notes...

Страница 35: ...s unique serial number The goods capacity WLL of the device The year of manufacture The standards to which the device is approved The ATEX rating of the product if applicable CE Marking Periodic Exami...

Страница 36: ...quiries reidlifting com www reidlifting com Printed using environment friendly processes and materials All information herein is copyright protected by REID Lifting Ltd All company and product names a...

Отзывы: