10
U32SE-5 FPI Direct Vent Gas Insert
INSTALLATION
G
K
L
A
B
C
A
B
D
E
C
MANUFACTURED
MOBILE HOME
ADDITIONAL
REQUIREMENTS
1)
Ensure that structural members are not cut or
weakened during installation.
2)
Ensure proper grounding using the #8 ground
lug provided.
3)
Appliance must be anchored to the fl oor with
the supplied anchoring methods.
MATERIALS REQUIRED
No electrical power supply is required for the gas
control to operate. A 120 Volt AC power cord is
hooked up to the fan. Plug the 3 wire cord into
a suitable receptacle.
Do not cut the ground
terminal off under any circumstances.
When
connected with 120 volts, the appliance must be
electrically grounded in accordance with local codes,
current version of CSA C22.1 (in Canada) or in the
absence of local codes, with the National Electrical
Code ANSI/NFPA 70-1987.
NOTE: This unit is equipped with a heat sensor
thermodisc which will prevent the blower
from operating until the unit reaches the
correct temperature.
INSTALLATION
CHECKLIST
Before installing vent system ensure that the damper
plate is open and secure to prevent the damper plate
from falling down and crushing the liner.
The FPI Gas Insert is installed as listed.
1)
Check all clearances to combustibles, (Refer to
sections "Minimum Fireplace Dimensions and
Clearances to Combustibles)
2)
Make the gas connection. (Refer to section
"Gas Connection")
3)
Install the 3" fl ue liner to the sliding connector
plate. (Refer to section "Flue Liner Installation.")
4)
Slide the unit half way into the fi replace.
5)
Pull the vent connector plate through the tapered
brackets and fasten to the front plate. Refer to
section "Flue Liner Installation.")
6)
Slide the unit fully into the fi replace.
7)
Test gas pressure (Refer to section "Gas Pipe
Pressure Testing"). Check aeration system
(Refer to section "Gas Insert Aeration System").
8)
Install 4-AA batteries into battery pack or optional
AC power adaptor.
9)
Install standard and optional features. Refer
to the following sections:
a. LP Conversion Kit
b. Glass Crystals
c. Optional Ceramic Spa Stones
d. Standard Flush Door
e. Contemporary Faceplate & Door Frame
f. Wall Thermostat
g. Remote Control
10)
Final check:
Before leaving this unit with the
customer, the installer must ensure that the
appliance is fi ring correctly. This includes:
a)
Clocking the appliance to ensure the correct
fi ring rate.
b)
Adjusting the primary air, if required, to
ensure that the fl ame does not carbon. See
"Gas Insert Aeration System" section.
c)
Ensuring that the appliance is venting
correctly.
MINIMUM FIREPLACE
DIMENSIONS
The minimum fi replace clearances & dimensions
for the FPI gas insert are shown in the following
diagrams:
CLEARANCES TO
COMBUSTIBLES
Minimum Clearances to Combustibles
From Unit
Sides
A
10" / 255 mm
Ceiling
B
47.5" / 1205 mm
Mantel
C
13" / 330mm
Max. Mantle Depth
G
12" / 305 mm
Min. Alcove Width
K
48" / 1220 mm
Max. Alcove Depth
L
36" / 915 mm
Max.Lentil
Bar Depth
A
Height
B
Depth
C
Width
(rear)
D
Width
(front)
E
9"
22"
14"
22-1/2"
26-1/2"
Содержание Sunrise U32SE-LP5
Страница 45: ...U32SE 5 FPI Direct Vent Gas Insert 45 NOTES ...
Страница 46: ...46 U32SE 5 FPI Direct Vent Gas Insert NOTES ...