8 | City Series CB60E
NOTE: Framing may be constructed of combustible material (ie. 2 x 4)and does not require steel studs.
Note: A combined minimum of 180
square inches of open area is required
for the convection air outlet to cool
the enclosure. Ensure clearances for
Convection Air Outlets are met.
See clearances CB60E in this manual
as there are different methods as to
how this can be achieved.
Note: This appliance must be in-
stalled on a level and solid surface
such as a plywood floor which must
be the full width and depth of the
appliance.
Framing
Dimensions
Description
Corner Kit
A
Framing Height
41-1/4” (1048 mm)
B
Framing Width
71-1/4" (1810 mm)
C
Framing Depth
20-5/16" (516mm)
D
Unit Base to Top Enclosure (Min.)
81-1/4"(2038 mm)
G
Vent Centerline Height
58-3/16" (1478 mm)
NOTE: Unit cannot be load-bearing. All finishing materials must be supported by the framing.
Maximum material
dimensions 2" x 4" for
header studs (installed
on edge and flat)
Framing Dimensions Corner Kit - Corner Install
(Right Corner)