background image

I1200 Regency Wood Insert

18

3)  Only burn seasoned wood!  

Avoid burning 

wet or green wood. Seasoned wood has 
been dried at least one year.

4)

  A small hot fi re is preferable to a large 

smouldering one that can deposit creosote 
within the system.

5)

  Check the chimney at least twice a month 

during the burning season for creosote 
build-up.

6)

  Have chimney system and unit cleaned by 

competent chimney sweeps twice a year 
during the fi rst year of use and at least once 
a year thereafter or when needed.

MAINTENANCE OF

GOLD-PLATED DOORS

The gold electroplated fi nish on the doors 
requires little maintenance, and need only be 
cleaned with a damp cloth. DO NOT use abrasive 
materials or chemical cleaners, as they may 
harm the fi nish and void the warranty.

DOOR GASKET

If the door gasket requires replacement, 7/8" 
diameter material must be used. A proper high 
temperature gasket adhesive is required. A 
gasket repair kit, Part # 846-570 is available 
from your local Regency dealer.

DOOR LATCH 

ADJUSTMENT

The door latch may require adjustment as the 
door gasket material compresses over time. 
Removal of the spacer washer, shown in the 
diagram below, will allow the latch to be moved 
closer to the door frame, causing a tighter 
seal. Remove and replace the nuts, washer 
as shown.  

MAINTENANCE

GLASS CLEANING

Do not attempt to clean the glass when it is hot, 
allow the glass to cool before cleaning. 

Do not use abrasive cleaners to clean the glass. 
Your local retailer can supply you with special 
glass cleaner if plain water and a soft cloth does 
not remove all deposits.

GLASS 

REPLACEMENT

Your Regency Insert is supplied with 5 mm. 
Neoceram ceramic glass that will withstand 
the highest heat that your unit will produce. In 
the event that you break your glass by impact 
- purchase your replacement from an authorized 
Regency dealer only, and follow our step-by-step 
instructions.

GLASS REMOVAL

Allow the stove to cool before removing or replac-
ing glass. Remove the door from the insert and 
remove the glass retainer.  Use caution when 
removing broken glass to prevent injury.

When placing the replacement glass in the 
door, make sure that the glass gasketing will 
properly seal your unit.  Replace the retainer 
and tighten securely, but do not wrench down 
on the glass as this may cause breakage.  Do 
not substitute materials. If your glass door does 
break, do not continue to use your unit until it 
has been replaced.

Содержание I1200S Wood Insert

Страница 1: ...Canada V4G 1H4 918 665a I1200S Wood Insert 07 12 07 Owners Installation Manual Tested by Installer Please complete the details on the back cover and leave this manual with the homeowner Homeowner Plea...

Страница 2: ...REGENCY DEALER in your area Keep those REGENCY FIRES burning SAFETY NOTE If this Insert is not properly installed a house re may result For your safety follow the installation instructions contact loc...

Страница 3: ...ation into a Masonry Fireplace 10 Installation into a Factory Built Fireplace 10 Faceplate Trim Optional Fan Support Installation 11 Fan Blower 14 Firebrick Assembly 15 Draft Control 15 Door Handle 15...

Страница 4: ...FROM INSERT BODY INSTALL ONLY ON A NON COMBUSTIBLE HEARTH RAISED F 1 5IN 38MM ABOVE AN ADJACENT COMBUSTIBLE FLOOR COMBUSTIBLE FLOOR MUST BE PROTECTED BY NON COMBUSTIBLE MATERIAL EXTENDING E 16 IN 405M...

Страница 5: ...I1200 Regency Wood Insert 5 UNIT DIMENSIONS WITH STANDARD FLUE ADAPTOR 6 152mm Diameter STANDARD FLUE ADAPTOR 171 932...

Страница 6: ...I1200 Regency Wood Insert 6 UNIT DIMENSIONS WITH OFFSET FLUE ADAPTOR 6 152mm Diameter OFFSET FLUE ADAPTOR 171 936...

Страница 7: ...your replace insert Install and use only in accordance with manufacturer s installation and operating instructions 2 Check your local building codes Build ing Inspection Department You may require a...

Страница 8: ...508mm 14 356mm 7 375 187mm 16 406mm 1 5 38mm 8 203mm HOW TO DETERMINE IF ALTERNATE FLOOR PROTECTION MATERIALS ARE ACCEPTABLE The speci ed oor protector should be 3 8 18mm thick material with a K facto...

Страница 9: ...rear of the unit into the replace See diagram 3 Ensure that the unit is centered in the existing replace and lined up with the ue adaptor 4 Slide the unit back until the ue adaptor is slightly engage...

Страница 10: ...EPLACE The insert must be installed as per the require ments of your local inspection authority Three methods of ue connection are acceptable in most areas these include 1 Positive ue connection where...

Страница 11: ...ded See Diagram 2 Diagram 2 Rear View 4 Position the assembled faceplate side and top to the insert Ensure to align the draft rod into the opening of the faceplate as well as the side faceplate slots...

Страница 12: ...mounting brackets and tighten to secure in place Diagram 5 Diagram 6 Shown with Optional Bottom Faceplate Regular Oversize Faceplate Trim Installation Black Trim included with Regular Oversize Facepl...

Страница 13: ...on the fan support to the bottom of the fan assembly 17 Drill 4 x 5 32 holes to the underside of the fan assembly using the holes in the fan support as a guide See Diagram 9 Diagram 9 Rear Bottom View...

Страница 14: ...placemaybeadjustedby increasing or decreasing the offset spacing of the clips 3 Ensure that the power cord is not in contact with any hot stove surfaces CAUTION Label all wires prior to disconnection...

Страница 15: ...If the two air tubes are installed continue on to Step 2 if not follow the instructions below Installtheairtubeintotheholesinthe side channels The notch goes on the right hand side with the air holes...

Страница 16: ...he re As you dry out your re brick and your masonry ue if applicable your draft will increase 10 Forthoseunitsinstalledathigherelevations or into sub standard masonry replaces drafting problems may oc...

Страница 17: ...lly operate the fan system push the rst switch to Man and second switch to either high or Low This will bypass the sensing deviceandallowfullcontrolofthefan Switching from Auto to Manual or High to Lo...

Страница 18: ...acer washer shown in the diagram below will allow the latch to be moved closer to the door frame causing a tighter seal Remove and replace the nuts washer as shown MAINTENANCE GLASS CLEANING Do not at...

Страница 19: ...y Door Gasket Kit 17 846 918 Hinge Caps 2 set Gold 19 948 101 Spring Handle Large Gold 20 948 102 Spring Handle Small Gold 170 915 Fan Blower Assembly 24 910 157 P Blower Fan Motor 25 910 678 Power Co...

Страница 20: ...aceplate Trim Set Oversize Black 171 926 Trim Set Oversize Brass 171 928 Bottom Piece and Fan Support Regular 171 930 Bottom Piece and Fan Support Oversize 60 Faceplate Right Side Regular Oversize 61...

Страница 21: ...Description 170 960 Complete Brick Set 70 Brick Regular Full Size 1 1 4 x 4 1 2 x 9 76 Brick Partial 1 1 4 x 2 x 9 81 Brick Partial 1 1 4 x 1 1 4 x 9 84 Brick Partial 1 1 4 x 4 1 2 x 8 85 Brick Partia...

Страница 22: ...I1200 Regency Wood Insert 22 NOTES...

Страница 23: ...of workmanship from unauthorized service persons or dealers At all times FPI reserves the right to inspect product in the field which is claimed to be defective All claims must be submitted to FPI by...

Страница 24: ...___________________________________________________ Printed in Canada Regency replace products are designed with reliability and simplicity in mind In addition our internal QualityAssurance Teamcarefu...

Отзывы: