background image

I1200 Regency Wood Insert

16

INSTALLATION

FIRST FIRE

When your installation is completed and in-
spected, you are ready for your fi rst

 

fi re.

1)

 Open 

draft 

control 

fully.

2)

 Open 

fi rebox door and build a small fi re using 

paper and dry kindling, wait a few minutes 
for a good updraft in the fl ue to establish the 
fi re. Leaving the door slightly open will help 
your fi re start more rapidly.

CAUTION: Never leave unit unattended 
if door is left open. This procedure is for 
fi re start-up only, as unit may over-heat 
if door is left open for too long.

3)

  With the draft still in the fully open position, 

add two or three seasoned logs to your fi re.  
Form a trench in the ash bed to allow air to 
reach the rear of the fi rebox prior to closing 
the door.

4)

  After about 15 to 20 minutes, when your 

wood has begun to burn strongly, adjust 
your draft control down to keep the fi re at a 
moderate level.

WARNING: Never build a roaring fi re in 
a cold stove.  Always warm your stove 
up slowly!

5)

  Once a bed of coals has been established, 

you may adjust the draft control to a low 
setting to operate the unit in its most effi cient 
mode.

6)

  During the fi rst couple of hours, keep the 

combustion rate at a moderate level and 
avoid a large fi re until the paint is cured. 
Only then can you operate the insert at its 
maximum setting, and only after the metal 
has been warmed.

7)

  For the fi rst few hours, the insert will give 

off an odour from the paint. This is to be 
expected as the high temperature paint 
becomes seasoned. Windows and/or doors 
should be left open to provide adequate 
ventilation while this temporary condition 
exists.  Burning the insert at a very high 
temperature the fi rst few times may damage 
the paint. Burn fi res at a moderate level the 
fi rst few days.

8)

  Do not place anything on the insert top 

during the curing process. This may result 
in damage to your paint fi nish.

9)

  During the fi rst few hours it may be more 

diffi cult to start the fi re.  As you dry out 
your fi re brick and your masonry fl ue (if 
applicable), your draft will increase.

10)

  For those units installed at higher elevations 

or into sub-standard masonry fi replaces, 
drafting problems may occur. Consult an 
experienced dealer or mason on methods 
of increasing your draft.

11)

  Some cracking and popping noises may be 

experienced during the heating up process. 
These noises will be minimal when your unit 
reaches temperature.

12)

 Before opening your door to reload, open 

draft fully for approximately 10 to 15 seconds 
until fi re has been re-established. This will 
minimize any smoking.

13)

  All fuel burning appliances consume oxygen 

during operation. It is important that you 
supply a source of fresh air to your unit 
while burning. A slightly opened window is 
suffi cient for this purpose.

CAUTION: If the body of your unit  starts 
to glow you are overfi ring. Stop loading 
fuel immediately and close the draft 
control until the glow has completely 
subsided.

14)

 Green or wet wood is not recommended for 

your unit.  If you must add wet or green fuel, 
open the draft control fully until all moisture 
has been dispersed by the intense fi re. 

 

Once all moisture has been removed, the 
draft control may be adjusted to maintain 
the fi re.

15)

 If you have been burning your insert on a 

low draft, use caution when opening the 
door.  After opening the damper, open the 
door a crack, and allow the fi re to adjust 
before fully opening the door.

16) 

The controls of your unit should not be 
altered to increase fi ring for any reason.

SCREEN DOOR

Hook screen to the inside on the right side 
of the fi rebox door opening. Lock in place by 
turning handle.

Back Side of Screen Shown

WARNING

Operate with doors fully open or fully 
closed. If doors are left partly open, 
gas and fl ame may be drawn out of 
the opening, creating risks from both 
fi re and smoke.

When operated with doors fully open 
the manufacturer supplied screen 
must be used.

NOTE:

 The handle must be positioned at 10 

o'clock when closed to avoid the handle from 
getting hot and to ensure the screen stays in 
place.

Handle Lock

Hooks

Handle at 10 o'clock position.

Содержание I1200S Wood Insert

Страница 1: ...Canada V4G 1H4 918 665a I1200S Wood Insert 07 12 07 Owners Installation Manual Tested by Installer Please complete the details on the back cover and leave this manual with the homeowner Homeowner Plea...

Страница 2: ...REGENCY DEALER in your area Keep those REGENCY FIRES burning SAFETY NOTE If this Insert is not properly installed a house re may result For your safety follow the installation instructions contact loc...

Страница 3: ...ation into a Masonry Fireplace 10 Installation into a Factory Built Fireplace 10 Faceplate Trim Optional Fan Support Installation 11 Fan Blower 14 Firebrick Assembly 15 Draft Control 15 Door Handle 15...

Страница 4: ...FROM INSERT BODY INSTALL ONLY ON A NON COMBUSTIBLE HEARTH RAISED F 1 5IN 38MM ABOVE AN ADJACENT COMBUSTIBLE FLOOR COMBUSTIBLE FLOOR MUST BE PROTECTED BY NON COMBUSTIBLE MATERIAL EXTENDING E 16 IN 405M...

Страница 5: ...I1200 Regency Wood Insert 5 UNIT DIMENSIONS WITH STANDARD FLUE ADAPTOR 6 152mm Diameter STANDARD FLUE ADAPTOR 171 932...

Страница 6: ...I1200 Regency Wood Insert 6 UNIT DIMENSIONS WITH OFFSET FLUE ADAPTOR 6 152mm Diameter OFFSET FLUE ADAPTOR 171 936...

Страница 7: ...your replace insert Install and use only in accordance with manufacturer s installation and operating instructions 2 Check your local building codes Build ing Inspection Department You may require a...

Страница 8: ...508mm 14 356mm 7 375 187mm 16 406mm 1 5 38mm 8 203mm HOW TO DETERMINE IF ALTERNATE FLOOR PROTECTION MATERIALS ARE ACCEPTABLE The speci ed oor protector should be 3 8 18mm thick material with a K facto...

Страница 9: ...rear of the unit into the replace See diagram 3 Ensure that the unit is centered in the existing replace and lined up with the ue adaptor 4 Slide the unit back until the ue adaptor is slightly engage...

Страница 10: ...EPLACE The insert must be installed as per the require ments of your local inspection authority Three methods of ue connection are acceptable in most areas these include 1 Positive ue connection where...

Страница 11: ...ded See Diagram 2 Diagram 2 Rear View 4 Position the assembled faceplate side and top to the insert Ensure to align the draft rod into the opening of the faceplate as well as the side faceplate slots...

Страница 12: ...mounting brackets and tighten to secure in place Diagram 5 Diagram 6 Shown with Optional Bottom Faceplate Regular Oversize Faceplate Trim Installation Black Trim included with Regular Oversize Facepl...

Страница 13: ...on the fan support to the bottom of the fan assembly 17 Drill 4 x 5 32 holes to the underside of the fan assembly using the holes in the fan support as a guide See Diagram 9 Diagram 9 Rear Bottom View...

Страница 14: ...placemaybeadjustedby increasing or decreasing the offset spacing of the clips 3 Ensure that the power cord is not in contact with any hot stove surfaces CAUTION Label all wires prior to disconnection...

Страница 15: ...If the two air tubes are installed continue on to Step 2 if not follow the instructions below Installtheairtubeintotheholesinthe side channels The notch goes on the right hand side with the air holes...

Страница 16: ...he re As you dry out your re brick and your masonry ue if applicable your draft will increase 10 Forthoseunitsinstalledathigherelevations or into sub standard masonry replaces drafting problems may oc...

Страница 17: ...lly operate the fan system push the rst switch to Man and second switch to either high or Low This will bypass the sensing deviceandallowfullcontrolofthefan Switching from Auto to Manual or High to Lo...

Страница 18: ...acer washer shown in the diagram below will allow the latch to be moved closer to the door frame causing a tighter seal Remove and replace the nuts washer as shown MAINTENANCE GLASS CLEANING Do not at...

Страница 19: ...y Door Gasket Kit 17 846 918 Hinge Caps 2 set Gold 19 948 101 Spring Handle Large Gold 20 948 102 Spring Handle Small Gold 170 915 Fan Blower Assembly 24 910 157 P Blower Fan Motor 25 910 678 Power Co...

Страница 20: ...aceplate Trim Set Oversize Black 171 926 Trim Set Oversize Brass 171 928 Bottom Piece and Fan Support Regular 171 930 Bottom Piece and Fan Support Oversize 60 Faceplate Right Side Regular Oversize 61...

Страница 21: ...Description 170 960 Complete Brick Set 70 Brick Regular Full Size 1 1 4 x 4 1 2 x 9 76 Brick Partial 1 1 4 x 2 x 9 81 Brick Partial 1 1 4 x 1 1 4 x 9 84 Brick Partial 1 1 4 x 4 1 2 x 8 85 Brick Partia...

Страница 22: ...I1200 Regency Wood Insert 22 NOTES...

Страница 23: ...of workmanship from unauthorized service persons or dealers At all times FPI reserves the right to inspect product in the field which is claimed to be defective All claims must be submitted to FPI by...

Страница 24: ...___________________________________________________ Printed in Canada Regency replace products are designed with reliability and simplicity in mind In addition our internal QualityAssurance Teamcarefu...

Отзывы: