City Series ACV60E
|
73
installation
920-313
12.23.20
6. Place Log 1 on top of the log guide. The pin under Log 1 and the log
guide will act as a guide for Log 1's proper positioning.
7. Install Log 2 to the left of Log 1. Make sure they are connected.
8. Install Log 3 to the right of Log 1. Rest the left side on the log guide.
Connect Log 1 and Log 3 to make the split between less visible.
9. Insert the pin of Log 4 into the hole. The left end of Log 4 should sit
31 mm from the edge of the panel, as shown below.
11. Insert the pin of Log 6 into the hole on the right side of the pilot.
Position the right end of Log 6 51 mm from the edge of the panel.
12. Insert the pin of Log 7 into the hole on the right-most side. Position
the left end of the log 29 mm from edge of panel, as shown below.
3
2
1
31 mm
4
10. Insert the pin of Log 5 into the hole on the left side of the pilot. Position
the left end of Log 5 54 mm from the edge of the panel.
5
54 mm
6
7
29 mm
13. Install one box (1.6 kg) of 19 mm black coal (optional) around the
logs installed on the panels, as shown below.
Correct Black Coal placement
Do not completely cover secondary air inlets-leave them 50% open.
51 mm
2
ACB60E/ACV60E CITY SERIES
Содержание City ACV60E
Страница 18: ...18 City Series ACV60E owner s information Glass Barrier Removal Glass barrier removal video ...
Страница 84: ...84 City Series ACV60E parts list Main Assembly ...
Страница 87: ...City Series ACV60E 87 notes ...
Страница 94: ...94 City Series ACV60E warranty ...
Страница 95: ......