
Drawing No. 1
Typical Installation of Flow Proportional Control
Drawing No. 2
SMARTVALVE Installation to Provide Both Manual and Automatic Operation
Drawing No. 3
Using REGAL Terminal Strips
Terminal Strips located in SMARTVALVE Junction Boxes
Drawing No. 4
Terminal Strip Designations
Drawing No. 5
Display Circuit Board (Part No. 7070)
Drawing No. 6
Power Supply Circuit Board (Part No. 7071)
Drawing No. 7
Use of External Surge Suppressors
Consult manufacturer of surge suppressor for installation and wiring specifics
Drawing No. 8
Control Valve Assembly for 10 to 500 PPD (Part No. 7003)
Drawing No. 9
Control Valve Assembly for 1000/2000 PPD (Part No. 7004)
Drawing No. 10
Engineering Data Sheet for SMARTVALVE Dimensions
Drawing No. 11
7500 Remote Meter Panel Assembly for 10 to 500 PPD Systems
Drawing No. 12
Remote Meter Panel Assembly for 1000/2000 PPD Systems
Drawing No. 13
Dosage Explanation
DRAWINGS AND PARTS LIST
5