background image

7

SEQUENCE OF OPERATION  

Any thermostat demand at the UI will turn on the corresponding thermostat indicator LED.
The display screen will populate the following information:

 

the thermostat demand (example:  W1) 

 

the airflow value directly below (%A/F) example:  60

 

the on delay value in seconds directly below (ON) example:  30

 

the off delay value in seconds directly below (OFF) example:  90

 

the operating state indicator dot (

) to the left of the current operation.

When the dot (

) is to the left of the (ON) delay value, the UI is waiting for the delay to 

time out.

The operation dot will move to the left of the airflow value, and the UI will turn on the 

motor at that value when the (ON) delay times out. 

 

If the (ON) delay value is set to (0), the operation dot will show up to the left of the 

airflow value when the thermostat demand is initiated, and the UI will turn on the 

motor. 

 

If the UI receives a corresponding SYSTEM input, the UI will turn on the motor even if 

the on delay has not timed out.

When the thermostat demand ends, the operation dot moves to the left of the (OFF) delay 

value. When the off delay times out, the motor turns off and the display returns to no 

demand or values displayed. 

 

If the off delay is set to (0), the UI will turn the motor off when the thermostat demand 

ends, and the display returns to no demand or values displayed.

No Demand from the Thermostat = No Operation from the UI

2nd Stage Demand Recognition and Operation

 

If the UI is receiving a 1st stage thermostat demand, it will transition to 2nd stage operation in the respective demand if one of the 

following occurs:

 

o

The UI receives the 2nd stage thermostat demand

 

o

The UI receives the 2nd stage SYSTEM input 

 

o

The UI (W2) or (Y2) time delay times out

 

When the UI receives a 1st stage thermostat demand followed by a 2nd stage demand, it will transition to the 2nd stage demands 

(%A/F) value and (ON/OFF) delay values on the display screen.

 

o

If the motor is operating when the UI receives the 2nd stage demand, the UI will transition the motor operation to the new 

2nd stage (%A/F) value.

 

o

If the 1st stage on delay has not timed out and the 2nd stage ON delay is (0), the UI will turn the motor on even if the 1st 

stage on delay has not timed out.

 

o

If the 2nd stage on delay is other than (0), and the 1st stage ON delay has not timed out, the motor will turn on when the 1st 

stage on delay times out. 

Continuous Fan Demand and Operation

 

If the UI is receiving a thermostat demand on (G), continuous fan, the motor will operate at the (%A/F) value on the display screen 

with no ON/OFF delay. 

 

o

If the UI receives any W or Y thermostat demand while it is receiving a G demand, the UI will transition the motor operation to 

the new (%A/F) value without delay. 

 

o

When all W and Y thermostat demands end, the UI will transition the motor operation back to the G (%A/F) value without 

delay. 

©2019, 2020 Regal Beloit Corporation, All Rights Reserved. MCIM20008E • Form# G0075E

Содержание Genteq Evergreen VS

Страница 1: ...ation or assistance The qualified installer or agency must use the supplied or recommended parts when installing or servicing this product After installing the Evergreen VS user interface and motor it...

Страница 2: ...d ECM Motors Model 2 5 motor Note The model 2 5 motor has the same physical appearance as the model 2 3 motor Always confirm model name on motor use ID guide information below if needed The Genteq 16...

Страница 3: ...in the system as connected by the HVAC OEM Install the new Evergreen VS motor 1 Install the new motor in the existing belly band mount so that the motor plugs are facing down between the 4 and 8 o clo...

Страница 4: ...e new motor Connect the 16 pin communication plug disconnected from the old motor to the UI Connect the thermostat wires from the UI to the HVAC system thermostat connections as follows o Connect the...

Страница 5: ...onnected to aTwo StageThermostat Single Stage HVAC Systems with a Single StageThermostat The thermostat wire designations and connections legend are provided on either side of the thermostat wire harn...

Страница 6: ...demand will appear on the display screen Press the up button to increase airflow the down button to decrease airflow This information is only present when there is a thermostat demand Airflow can only...

Страница 7: ...stat No Operation from the UI 2nd Stage Demand Recognition and Operation If the UI is receiving a 1st stage thermostat demand it will transition to 2nd stage operation in the respective demand if one...

Страница 8: ...f delay values A thermostat demand for 2nd stage cool or heat pump should turn on the Y2 LED thermostat indicator on the UI The display screen on the UI should display Y2 the airflow value and the on...

Страница 9: ...pump demand o W1 and Y1 1st stage airflow values are locked They will increase and decrease incrementally with changes to the W2 and Y2 airflow values Continuous fan Operate the thermostat in continuo...

Страница 10: ...ion of the motor to the operation of the HVAC system To enter the options menu press and hold the OPTIONS button for 10 seconds The UI must be unlocked The display will give instructions for using the...

Страница 11: ...hen turn off You can exit the DIAGNOSTICS screen at any time by pressing the up down AIRFLOW arrows This will return you to the options menu o The information on this screen is simply a place for us t...

Страница 12: ...pm CST Monday Friday at 866 503 8566 Option 3 Scan this code with your smart phone or go to www EvergreenVS motors com Terms Conditions of Sale Limited Warranty Sales of the products described in this...

Отзывы: