Commissioning
45
Testing the Electrical Safety
REFUsol 20K...33K-2T
982079 | 05 | 2021-03
En
gl
is
h
D
eu
ts
ch
The Ethernet and WiFi stick have an internal flash
memory that temporarily stores the most important
data in case of communication interruption. As soon as
communication is available again, the stored data is
automatically sent to the REFUlog monitoring portal.
▷
To view the inverter data, open the website
www.refu-log.com with a browser and register as a
new user.
5
Commissioning
5.1 Testing the Electrical Safety
▷
Carry out initial commissioning test according to
IEC 62446-1.
5.2 Commissioning the Inverter
1. Switch on the DC switch.
➪
The inverter starts and after a short waiting time it
is ready for setting and parametrising the inverter.
2. Set the menu language.
3. Set the date and time.
4. Set country code.
5. Switch off the DC switch and wait 5 minutes.
6. Switch on the DC switch.
7. Switch on the AC switch.
➪
The inverter goes into feed-in operation (normal).
8. Check and document the correct settings of all
safety-related parameters.