Installation
Vacuum spray degassing — 28.08.2019 - Rev. B
English — 19
6.5.1
Terminal diagram
Item
numbers
Terminal
number
Signal
Function
Wiring
1
1
GND
RS485 interface
User, optional
2
A
3
B
2
4
P3
External make-up request.
•
With Levelcontrol setting. Input 230 V signal via
L+N.
User, optional
5
P4
3
6
WM1
Insufficient water external - digital input.
User, optional
7
WM2
4
8
K1
Contact water meter
User, optional
9
K2
5
10
24 V
Conductivity - analogue input 4-20 mA
User, optional
11
INP
12
GND
6
13
WM1
---
---
14
WM2
7
15
24 V
Pressure sensor - Analogue input 4-20 mA
Factory
16
INP
17
GND
8
18
GND
---
---
19
24 V
20
OUT
21
AIN
9
22
N
Motorized ball valve on the make-up side
Factory
23
M3
10
24
N
Motorized ball valve on the system side
Factory
25
M2
Содержание Servitec S
Страница 1: ...Vacuum spray degassing 28 08 2019 Rev B Servitec S GB Operating manual Original operating manual...
Страница 2: ......
Страница 32: ......
Страница 33: ......