Installation
Vacuum spray degassing — 28.08.2019 - Rev. B
English — 15
6.3.3
Degassing line to the system
Installation detail of the "DC" degassing line
Install the "DC" degassing lines as follows:
•
Prevent an overload of the "ST" dirt trap in the device
caused by coarse dirt.
•
Install the gas-rich degassing pipe “DC” upstream of the
gas-poor degassing pipe (when viewed in the system
flow direction).
•
Preferably install on the return side of the facility
system.
–
The water temperature must be in the range of 0
°C – 70 °C to ensure sufficient degassing
capacity.
Device installation in a heating system – Pressure maintenance with bladder "MAG" expansion vessel
1
Heating system
4
Device
2
Bladder expansion vessel
5
"DC" degassing line (gas-rich water)
3
For optional equipment and accessories, see
chapter 4.5 "Optional equipment and accessories"
on page 10
6
"DC" degassing line (degassed water)
Proceed as follows:
•
Connect the "DC" degassing lines in the "V" main volume flow of the facility system.
•
The device requires two "DC" degassing lines to the facility system.
–
One degassing line for the gas-rich water from the facility system
–
One degassing line for the degassed water back to the facility system.
•
Fit the degassing lines near the "EC" expansion line.
–
This ensures stable pressure conditions.
•
Install the device near the "MAG" expansion vessel.
–
This ensures pressure monitoring of the expansion vessel.
–
Set the "Magcontrol" operating mode at the device controller.
Note!
•
Ensure the integration with the "V“ main flow volume. in particular in switching variants with hydraulic
switching points and return admixtures.
–
For switching and make-up variants, see chapter 6.4 "Switching and make-up variants" on page 16 .
Содержание Servitec S
Страница 1: ...Vacuum spray degassing 28 08 2019 Rev B Servitec S GB Operating manual Original operating manual...
Страница 2: ......
Страница 32: ......
Страница 33: ......