31
8. Preparations
The model ship „Discovery II“ is delivered ready for operation. Only a few steps, such as installation of the receiver
system and assembly of ballast keel, mast and sail, are required for commissioning.
Before completing the model or taking it into operation, read each section carefully. The construction stages are
almost always illustrated for better understanding.
Note that the numbers in the text always refer to the components in the illustration to the right.
Only carry out the steps described in the different sections if you have completely understood the procedure and know
exactly what to observe.
a) Boat Rack Assembly
The scope of delivery includes a boat rack of wood
parts that has to be assembled before first use.
Then install the tail spur as shown in figure 1.
Figure 1
Содержание 1195424
Страница 18: ...18 Bild 13 ...
Страница 40: ...40 Figure 13 ...
Страница 62: ...62 Figure 13 ...
Страница 84: ...84 Afbeelding 13 ...
Страница 90: ...90 ...
Страница 91: ...91 ...