![Reechcraft PowerPole Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/reechcraft/powerpole/powerpole_operators-safety-manual_1430917020.webp)
20
secti
On
3
ERECTING THE SYSTEM
7. At the mast base, it is necessary to ensure the bottom of the mast
assembly will not rotate or slide in any direction along the base
surface. This can be accomplished by driving spikes into the ground
through the holes in the base plate.
8. Alternatively, another standoff tie can be secured to the mast just
above the base plate and fastened to the structure.
9. 6 ft (1.83 m) and 12 ft (3.66 m) masts can be joined together to reach the
maximum work height of 75 ft (22.9 m). Heights over 24 ft (7.3 m)
require mid-bracing every 16 ft (4.9 m) or less. Refer to Section 6
“Passing a Middle Tie”. Be sure to secure the standoff tie to meet the
pull-out force per (Fig. 3.7).
10. Referring to the layout plan, repeat the steps above as necessary to
properly erect each mast assembly.
ERECTING THE STANDARD CONFIGURATION (cont’d)
Fig. 3.5
Fig. 3.6
Fig. 3.7
PULL-OUT FORCE FOR STANDOFF TIE
Pullout Force for Each Screw [4 screws total]
125 lbs (57 kg) [ 500 lbs total]
Содержание PowerPole
Страница 1: ...Operator s Safety Manual www reechcraft com powerpole P N 4026579...
Страница 8: ...8 Section 1 GENERAL SYSTEM INFORMATION CLIMBING UNIT WITH PLATFORM SUPPORTS Fig 1 1 Fig 1 2...
Страница 9: ...www reechcraft com PowerPole 888 600 6160 9 Section 1 GENERAL SYSTEM INFORMATION Fig 1 3 MAST ASSEMBLY...
Страница 42: ...42 Section TRANSPORT STORAGE AND MAINTENANCE 7 inspection and Maintenance Logs...
Страница 48: ...Reechcraft Inc 845 34th St N Fargo ND 58102 888 600 6160 www reechcraft com PowerPole...