![Reechcraft PowerPole Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/reechcraft/powerpole/powerpole_operators-safety-manual_1430917019.webp)
www.reechcraft.com/PowerPole
888-600-6160
19
secti
On
3
ERECTING THE SYSTEM
5. Once the standoff tie is secured, position the climbing unit and mast
assembly with the base close to its final position. Important: Before
erecting mast into position, thoroughly examine area from the
ground up to be sure there are no electrical lines or other
obstructions that will interfere with the erection of the assembly.
6. By starting at the top end of the assembly, lift the assembly and walk
towards the structure while continuing to tilt the assembly upward
into position. Complete the connection to the standoff tie by fully
securing the swivel joint to the
mast. Visually and physically
check to ensure the connection
is secure before continuing.
ERECTING THE STANDARD CONFIGURATION (cont’d)
Fig. 3.3
Fig. 3.4
Содержание PowerPole
Страница 1: ...Operator s Safety Manual www reechcraft com powerpole P N 4026579...
Страница 8: ...8 Section 1 GENERAL SYSTEM INFORMATION CLIMBING UNIT WITH PLATFORM SUPPORTS Fig 1 1 Fig 1 2...
Страница 9: ...www reechcraft com PowerPole 888 600 6160 9 Section 1 GENERAL SYSTEM INFORMATION Fig 1 3 MAST ASSEMBLY...
Страница 42: ...42 Section TRANSPORT STORAGE AND MAINTENANCE 7 inspection and Maintenance Logs...
Страница 48: ...Reechcraft Inc 845 34th St N Fargo ND 58102 888 600 6160 www reechcraft com PowerPole...