Redpath Statesman 2.43m x 3.65m Скачать руководство пользователя страница 22

22 

 

EXTERIOR SINGLE DOOR TRACK 

 
This door track is the same as the partition & bolts to the door track support by inserting bolts into the bolt slot of the door track, 
pushing them through the corresponding 3 holes in the door track support, put nuts on and tighten them up.  Fit the door, carrying 
out the up/down movement previously described to get the correct position in the bottom door guide.  Attach the small angle 
support to the top right of the right hand roof corner bar.  “Fine tune” as before if necessary. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

EXTERIOR DOUBLE DOOR TRACK 

 
This fits in exactly the same way as the single door track and is “fine tuned” accordingly.  However it has a small angle bracket on 
the left hand roof corner bar as well as the right corner bar. 
 
The small glazing bar above the MIDDLE of the door can now be fitted.  Put the glazing beading into the grooves and trim to suit.  
Insert 2 bolts into the bar and put them through the holes in the top door track and apex gusset plate.  Put nuts on and tighten up. 
 
NOW YOU CAN FIT THE VENT TO THE RIDGE 
 
Before sliding the vent into the ridge, slide a piece of black tube into the vent hinge socket.  Slide the vent into position, insert a 
small self-tapping screw into the tube approximately ½ way along then tighten the screw.  The tube will expand and lock into 
position thus preventing sideways movement of the vent.  N.B.  There is no hole for the screw but it will easily push into the tube 
and screw up.  (Key point
 
You only require one tube per vent on the left hand side of the vent socket (viewed from inside the greenhouse). 

 
 
 
 
 
 
 
 
 
 

Having slid the vents form the end of the ridge to the desired position, you can now fit the “slam bars” to the 2 glazing bars.  Utilise 
the bolts you inserted during general assembly and position the “slam bars” just under the vent allowing the casement stay to 
effectively close.  The slam bar can be adjusted later to facilitate good opening and closing of the vent. 
 
FITTING THE DOOR TO THE STRUCTURE 
 
The door slides on to the frame from the left hand side. 
Put the door bottom rail into the bottom door track and slide to the right, feed the first wheel into the upper door track and move 
further to the right until the black draught excluder butts up to the end glazing bars.  Carefully ease the door past the glazing bar 
and feed in the second wheel.  Push further to the right until both draught excluders are butting up to both end-glazing bars.  
Carefully ease the door past the two glazing bars.  The door will now run quite freely.  To square up the door with the spacing, 
undo the upper bolts holding the door track.  There is a little play to facilitate “fine tuning” of the door. 
N.B. sometimes the door can be a little stiff prior to glazing but once the PolyCarb has been inserted (the last job of the 
construction) the extra weight will make for smooth running.  (Key Point

 

 

Align end of door track with door in fully closed position.

 

 

Use slot located under here 

Содержание Statesman 2.43m x 3.65m

Страница 1: ...ons Illustrations for the Redpath Statesman Series Polycarbonate greenhouse 2 57m x 3 80m or 2 57m x 5 04m 16 Bounty Place Kelvin Grove Palmerston North 4414 Freephone 0508 733 728 www redpath co nz Effective from 15 Oct 20 ...

Страница 2: ...2 ...

Страница 3: ...3 IF SUPPLIED ...

Страница 4: ...rack support in it it has double the amount of panels 22 Door Posts In pairs 1 1 N B Double Door has 2 pairs 23 Cantilevers T Bar Brace Small 3 Large 6 13 24 Bag of Fittings 1 1 25 Glazing Beading 400 500 26 Gusset Plates Eave 4 4 Ridge 2 2 27 Casement Stays 2 4 28 Top Door Track 1 1 29 Polycarbonate sheeting see last page of instructions included cut to length 30 20mm square aluminium strongbacks...

Страница 5: ...hen this measurement is equal is the base square Check the level using a builder s spirit level in directions A B C The building its Polycarbonate cladding relies on the buildings base being level in all directions The height of the base is typically up to 150mm above ground level with a portion of the base being below ground level If using Timber for the base the base will need to be secured to t...

Страница 6: ...tilizers fungicides and insecticides etc in the Polycarbhouse Do not use chemicals that are for outside use only Always read the labels very carefully Do not push or lean on the PolyCarb panels Do not lean weighty objects onto the PolyCarb Use extra care when moving heavy or awkward objects such as tables poles internal frames etc within or near the Polycarbhouse Do not latch the door when anybody...

Страница 7: ...ix the combined eaves and gutter bars to the glazing bars by pushing the bolt previously inserted through the holes in the lower flange of the eave and secure with a nut Ensure that the glazing bar is pushed up under the gutter and is tight up against the inside shoulder of the eave Key Point Do the same with the rest of the glazing bars 4 Fix the cill in a similar way to 3 above but start with th...

Страница 8: ...orner bars taking care not to stretch the material Trim off any surplus level with the end of the bars N B The corner bars have 3 grooves to receive the glazing bead do not put any in the middle one Key point 3 Lay out the components of the frame on the ground as though you were standing on the inside i e with the bolt slots uppermost Ensure that having correctly identified the roof from the side ...

Страница 9: ...9 G R GR GLAZING RUBBER GR GR GR GR GR GR NO Glazing Bead ...

Страница 10: ...l in a similar manner to 11 above the two longer bars to the middle holes and the shorter ones to the outer holes Before attaching the nuts to the longer bars place the diagonal angles onto the bottom bolt and put a nut on fingertip tight only Attach the other end of the angle brace to the bottom bolt of the eave gusset plate put on the nut and finger tip tighten Key Point Do the same with the oth...

Страница 11: ...d cill marked door end 1 Main door Track Support this section is taped up with the door panels not with the door end Key point From the main bag of fittings you need Nuts bolts glazing beading and gusset plates 1 large ridge plate 2 small eave plates Remember these plates are not in the pack of fittings but are taped together with the casement stays elsewhere in the box ...

Страница 12: ...hat attach to the 2 shorter vertical glazing bars at a point immediately above where the diagonal angle bolts to the bar then to the longer middle bars horizontally along which thus ensures the doorway remains well braced and perpendicular 4 The main door track support taped up with the door panels can now be fitted at a point half way between the horizontal angle and the corner bar It is importan...

Страница 13: ...om unequal angle PROCEDURE 1 Follow the text and drawing on the previous pages as the construction is the same apart from some bars being shorter longer and thicker 2 Having fitted the main door track support in a similar way to the single one you must not fit the short glazing bar that goes above it at this stage Key point This will be fitted later when the doors have been installed see later tex...

Страница 14: ...ttom rail uppermost The top rail is arranged in such a way that the squared off end is to the bottom and the hooked hinge uppermost 3 Slide the glazing beading into the slots in the side and top rails and trim to suit 4 Insert a bolt into each end of the side rail bolt slots put these bolts through the holes in the top and bottom rails add nuts and lightly tighten Check that all joints are secure ...

Страница 15: ...els with the No 8 half inch self tapping screws DO NOT fix the top left hand side screw yet The screw will go in more easily and without danger of trying to go crooked if you can put a small amount of grease on the screw before assembling the doors Alternatively you could insert the screws into the screw eyes of the door panels before assembling the door this would have the effect of pre self tapp...

Страница 16: ...iece of the door Push up to the top of the door and trim off surplus at the bottom With pair of pliers squeeze the groove together at the bottom so that the rubber will not slip down when the door is in its upright position 9 Do not fit the door to the gable at this stage wait until the structure is fully assembled prior to glazing ...

Страница 17: ...of one of the handed doorposts Insert bolts into the bolt slot of one of the handed doorposts attach the angle and put on and tighten the nuts ASSEMBLY OF THE GREENHOUSE UNIT PROCEDURE 1 With the help of a willing assistant stand up the rear gable and one of the sides Standing on the inside of the structure with the gutter facing away from you insert the eave gutter bar into the gap between the co...

Страница 18: ...18 ...

Страница 19: ...ghten the nuts 7 The roof bars can now be attached to the structure but first you must slide the glazing beading into the bars and trim to suit Key Point Attach the bars firstly at the ridge sliding a bolt into the bolt slot of the roof bars and placing the bolt through the holes in the flanges of the ridge Put a nut on and immediately prior to tightening ensure that the roof bar is pushed up hard...

Страница 20: ...e ridge bolts to the corner bars at the rear end The angle travels diagonally down to the first glazing bar at the eave gutter You fit one each side at the rear of the greenhouse If you have the longer house you put another 2 at the front end 11 You can now attach the T bar cantilevers which bolt to the sidebars and roof as indicated in point 8 Before tightening these cantilevers up make sure ther...

Страница 21: ...E TIMBER OR CONCRETE Having built your base level and square and to the outside measurements given on page 4 sit the greenhouse onto the base The 4 cills will lip over the edge of the base and will protrude approx 7mm all the way round Drill through the cill and into the timber brickwork screw through the hole using a treated screw and washer Create an anchor point every 610mm i e at each glazing ...

Страница 22: ...s no hole for the screw but it will easily push into the tube and screw up Key point You only require one tube per vent on the left hand side of the vent socket viewed from inside the greenhouse Having slid the vents form the end of the ridge to the desired position you can now fit the slam bars to the 2 glazing bars Utilise the bolts you inserted during general assembly and position the slam bars...

Страница 23: ...t each end KEY POINT The glazing IS 6MM thickness Polycarbonate twin wall sheeting The Polycarbonate sheeting has printing on its protective film to indicate which face MUST FACE to the outside UV Shielded side Start with the PolyCarb on the side Insert 4 or 6 stainless steel clips as illustrated on either side of the panel The upper 2 clips approx 13mm from the top edge of the PolyCarb the bottom...

Страница 24: ...ct 20mm square Aluminium Strongbacks are supplied with this Polycarbonate greenhouse to strengthen the Polycarbonate sheeting assist in preventing it from bowing and to give improved performance in windy conditions You will need to fit a 75mm piece of the white double sides 3mm thick foam tape to each end of each strongback The strongbacks are positioned as shown in the below pictures and the draw...

Страница 25: ... roof of the greenhouses and Polycarbonate is used on the side walls of the greenhouse The fitment of the glass to the roofing is different The C shaped stainless steel band clips shown in the picture below are used to secure the panes of glass to the roof bars Also the overlap clips as shown on page 23 are used where the glass sheets overlap themselves ...

Страница 26: ...26 ...

Страница 27: ...on that these coatings are able to offer This might include damage from chemical sprays or paints excessive humidity etc 6 The warranty is not transferable and only applies to new building sales 7 This pro rata warranty requires that basic maintenance completed by the customer E G regular cleaning avoidance of poor operating conditions 8 Any warranty claim must be advised in writing to Redpath Pac...

Отзывы: