3.
Now stand up the door end assembly (double or single door end are attached in the same way) and repeat the above
procedure.
4.
Stand up the other side frame and repeat the operation outlined in 1 and 2 above at both corners.
5.
The bottom cill of the sides attaches to the corner bars in a similar way. Undo the nuts and bolts inserted in the gable end
assembly, move the cill under the corner bar so that the elongated hole in the vertical flange of the side cill lines up with the
bolt slot in the corner bar. Move the bolts down the slot into the slotted hole, put a nut on and tighten up, ensuring that
the corner bar is pushed right down into the angle of the cill. Do the same at the other 3 bottom corners.
6.
The ridge bar is fitted next, but first you must thread the glazing beading into the 2 grooves on the ridge. (Key Point). Lift
the ridge bar up to the apex and standing on a pair of sturdy and safely placed stepladders push the ridge into the small gap
between the roof corners so that the 2 flanges which form the angle of roof are tight up against the inside edge of the
corner bars. The vertical part of the ridge is outside and pointing skywards. Undo the nuts and bolts previously inserted
during gable end assembly and push them upwards into the slotted holes of the ridge. Tighten the nuts.
7.
The roof bars can now be attached to the structure but first you must slide the glazing beading into the bars and trim to
suit. (Key Point).
Attach the bars firstly at the ridge, sliding a bolt into the bolt slot of the roof bars and placing the bolt through the holes in
the flanges of the ridge. Put a nut on and immediately prior to tightening ensure that the roof bar is pushed up hard against
the ridge. Do not attach the bottom of the bars to the eave until all the roof bars are bolted to the ridge. (Key Point)
8.
Now attach the bottom of the roof bars to the eave/gutter bar into the holes in the upper flange. Start with the middle bars
either side of the ridge. You will need to insert extra bolts into each bar that has a vent opening and a cantilever tee-bar
brace.
The 2.43m x 3.80m has 3 small tee-bar braces – 3 in the roof & 6 large tee-bar braces – 3 each side.
The 2.43m x 5.04m has 13 large tee-bar braces – 5 each side and 3 in the roof.
You must remember to insert one extra bolt per cantilever T-bar brace and one per vent per bar. In addition one extra bolt
would be needed on the bar next to the middle where you require the vent to go. If you have purchased a partition with
your greenhouse you will be 2 roof bars short of a full pack. Omit one each side of the ridge at the point where the
partition is to be situated i.e. at the same place where you omitted the side glazing bars.
Hint: Wetting the neoprene
beading or the frame
with soapy water eases
its installation
Содержание Statesman 2.43m x 3.65m
Страница 2: ...2 ...
Страница 3: ...3 IF SUPPLIED ...
Страница 9: ...9 G R GR GLAZING RUBBER GR GR GR GR GR GR NO Glazing Bead ...
Страница 18: ...18 ...
Страница 26: ...26 ...