29.  Ensure  that  the  entire  length  of  the  left  hand 

side flashing is clipped at every batten. 

 

30.  Repeat  the  process  for  the  right  hand  side 

flashing  ensuring  the  entire  length  is  clipped  at 
every batten. 

 

 

31. 

Use  the  tables  to  determine  the  height  and 
position  of  the  25mm  wide  tile  support/clip 
batten, and whether this is to be fixed to the 
rafters  or  a  tiling  batten

.    This  should  extend 

each  side  to  (and  over)  the  first  rafter  beyond 
the  side  gutters.  The  support/clip  batten  should 
support the tiles or slates at the same plain and 
angle as those generally on the roof slope, and 
enable them to be clipped as required. 

If  fixed  to  rafters,  the  batten  must  not  be  less 
than  32mm  high  (packed  under  if  required  with 
batten  timber),  and  fixed  at  all  crossings  with 

galvanised  nails  of  length  to  penetrate  the 
rafters at least as much as the batten fixings. 

If fixed to a tiling batten:   Either - fix at 300mm 
centres  with  galvanised  nails  that  nearly  fully 
penetrate  the  tiling  batten  (which  must  be  at 
least  25mm  thick);    Or  -  fix  through  battens  to 
rafters  at  all  crossings  with  galvanised  nails  of 
length to penetrate the rafters at least as much 
as the batten fixings. 

 

 

32. 

(See  also  Diagram  –  Item  “31”):

    Install  the 

self-adhesive  Sealband  foam  strip  across  the 
entire width (left to right) of the upper gutter and 
heads of the side gutters. Ensure that the gutter 
is clean and dry, and then peel off the protective 
strip from one 2m strip and stick the foam to the 
surface on the roof slope, abutting the upstand. 
Measure  and  cut  the  required  length  from  the 
second 2m strip, then stick as a continuation of 
the first strip, ensuring a good butt joint with no 
gaps. 

The tiles must lap the gutter upstand by at least 
the  minimum  headlap  for  the  tile  and  pitch  and 
not less than 100mm. 

If  the  required  minimum  tile  lap  cannot  be 
achieved  over  the  gutter  upstand,  first  install 
and  properly  fix  a  strip  of  BS  747  5U  Felt  over 
the  upstand  and  support/clip  batten.  Add  extra 
battens  if  required  to  ensure  that  the  required 
lap  is achieved (up-slope from clip batten), and 
that  the  felt  does  not  span  more  than  40mm 
(between  upstand  and  support/clip  batten).  
This should be held against the upstand by the 
Sealband  strip  (also  use  suitable  waterproof 
adhesive if required). A suitable proprietary self-
adhesive  roofing  tape  can  be  used  in 
accordance  with  manufacturer’s  instructions 
and  recommendations,  instead  of  the  5U  Felt..  
The 

full  tables

  show  which  tiles  and  batten 

gauges will require this “Top Flashing”. 

Содержание ST4

Страница 1: ...42742 Email irelandsales redland monier com Technical Solutions Hotline Telephone 08708 702595 Fax 08708 702596 Email irelandtechnical redland monier Republic of Ireland www redland ie Customer Service Hotline Telephone 01 450 2796 Fax 01 450 2798 Email enquiries redland monier com Technical Solutions Hotline Telephone 01 450 2796 Fax 01 450 2798 Email solutions redland monier com Integration into...

Страница 2: ...tal setting out information appropriate for the tiles being used Reference to the charts tables and details is highlighted in bold in these instructions Plain Cambrian and DuoPlain tiles and natural slate require special instructions and details see separate document Integration with tiles other than Redland tiles will also require special consideration January 2009 Optional Equipment Datalogger a...

Страница 3: ...commended that the plumbing installation be carried out checked and commissioned by a competent plumber who is suitably trained for solar thermal installations BPEC or similar The system must be filled commissioned and tested in accordance with the pump station manufacturer s instructions and specification including a pressure test to the specified pressure Commissioning in accordance with the CIB...

Страница 4: ... and pins Panel Pack 3 8 9 5mm AF Socket Bit for power drill Screwdriver Tool Pack BS 747 5U Felt 150mm strip or suitable self adhesive roofing tape not supplied Suitable crane and or lifting equipment for weight 120kg ST 4 180kg ST 6 not supplied STAGE 3 Connection to the Hot Water System This will depend upon the system and pump station employed we offer the FlowCon A single line or FlowCon B tw...

Страница 5: ...oof to secure the underlay 4 Set out the tiling battens in the normal way gauge determined from maximum batten gauge for roof tile selected and the distance between top of the eaves course batten and top of the top course batten near the ridge Check table at 6 to ensure that gauge is suitable and adjust gauge if required 5 Ensure the tiling battens are fixed into the intersection of each rafter wi...

Страница 6: ... Up Range mm From Batten mm 256 Under 263 180 263 264 5 185 Over 264 5 Under 275 Unsuitable Gauge 275 Under 292 5 150 292 5 Under 301 200 301 Under 303 220 303 Under 305 225 305 307 228 305 to 355mm Gauge Tiles Stonewold II BATTEN Gauge BAR Distance Up Range mm From Batten mm 305 Under 308 225 308 309 230 Over 309 Under 323 Unsuitable Gauge 323 Under 341 205 341 Under 346 245 346 Under 348 260 348...

Страница 7: ...ust be drilled and countersunk with the tool provided a combination of existing and new holes can be used if appropriate The panel fixings should wherever possible be between the rafters spanned by the bar and never cantilever more than 100mm beyond a bar rafter fixing The panel fixings must never be less than 30mm from the bar ends All panel fixing points must be used The bar rafter fixings must ...

Страница 8: ...he packing pieces are square and central to the bars and rafters and orientated to provide the maximum surface contact with the rafters and bars A 2 5mm diameter drill bit is provided for pilot holes to ensure that the screws are square to the rafters and that the timber does not split 10 The standard position for the upper fixing bars is 2000mm up slope from the lower fixing bars but this dimensi...

Страница 9: ...side of the ST 4 ST 6 panel there are three hoses for the water inlet water outlet and temperature sensor To provide a weatherproof hole or holes through the roofing underlay for these hoses the underlay seal s supplied should be used The pipes need to pass through the underlay and rigid sarking insulation et cetera immediately above the upper fixing bars but the horizontal position of the entries...

Страница 10: ...e bottom edge engages over the top edge of the lower Fixing Bar Adjust sideways to align with the side gutter positions marked earlier at 13 on the upper fixing bars 17 With the Panel held in this position release the transit ties from the pipes then carefully pass the pipes through their appropriate underlay seal s then gently lower the Panel until it rests on the rafters and fixing bars whilst e...

Страница 11: ...n the fixing bar and the roofing underlay to further help protect the underlay during the drilling operation Repeat this process for all the panel fixing holes six holes for ST 4 and eight holes for ST 6 adjusting the bit projection as required 22 Once all the pilot holes in the upper and lower panel fixing bars have been made the panel is ready to be screw fixed to the fixing bars using the 6 3mm...

Страница 12: ...an be concealed using the provided panel covers as shown 26 The lower panel screw covers can be clipped into place with the gentle tap of a hammer 27 Once all the panel screws have been fixed the screw heads of the upper panel fixing screws are concealed using the screw head caps provided as shown 28 Now that the panel is secured the next step is to secure the edges of the left hand and right hand...

Страница 13: ...at least as much as the batten fixings 32 See also Diagram Item 31 Install the self adhesive Sealband foam strip across the entire width left to right of the upper gutter and heads of the side gutters Ensure that the gutter is clean and dry and then peel off the protective strip from one 2m strip and stick the foam to the surface on the roof slope abutting the upstand Measure and cut the required ...

Страница 14: ...anel The tiles should be laid to butt up against the central upstand of the side flashing with interlocks removed With a hammer knock off any tile nibs that lap over or into the gutter All the tiles abutting the panel should be mechanically fixed to the tiling battens in accordance with the fixing specification for the roof Note Contact Redland Technical Solutions for a correct fixing specificatio...

Страница 15: ...ter lap as specified above Tiles clear the lower side of the gutter head of panel frame by at least 25mm Always ensure that the tiles Are mechanically fixed as specified regard as eaves Compress and hold the foam strip to form provide good weather protection Properly hold down the upper gutter onto the battens Are properly seated on the tile support clip batten If eaves clips are not specified and...

Страница 16: ...tation should be connected to an expansion vessel as shown above At the top of the FLOWCON B unit there are two pipe connections these being for the ST 4 ST 6 panel flow and return pipes The connections for the flow and return pipes to and from the hot water cylinder not supplied are at the bottom of the FLOWCON B pump station The pump is on the right hand side viewed from front and should be on t...

Страница 17: ...s DN16 pipe work we supply a pack for each additional panel in lieu of the standard connection kit i e one panel will need the standard connection kit and each additional panel will require a connector pack for additional panels If the solar loop comprises 15mm or 22mm copper pipe work use an appropriate standard connection kit for each panel and appropriate copper fittings to form the tees 48 The...

Страница 18: ...18 of 28 ST BARS V1 RKA 03 02 2009 ST 4 ...

Страница 19: ...19 of 28 ST BARS V1 RKA 03 02 2009 ST 4 ...

Страница 20: ...20 of 28 ST BARS V1 RKA 03 02 2009 ST 4 ...

Страница 21: ...21 of 28 ST BARS V1 RKA 03 02 2009 ST 6 ...

Страница 22: ...22 of 28 ST BARS V1 RKA 03 02 2009 ST 6 ...

Страница 23: ...23 of 28 ST BARS V1 RKA 03 02 2009 ST 6 ...

Страница 24: ...24 of 28 ST BARS V1 RKA 03 02 2009 ...

Страница 25: ...25 of 28 ST BARS V1 RKA 03 02 2009 ...

Страница 26: ...26 of 28 ST BARS V1 RKA 03 02 2009 ...

Страница 27: ...27 of 28 ST BARS V1 RKA 03 02 2009 ...

Страница 28: ...28 of 28 ST BARS V1 RKA 03 02 2009 ...

Отзывы: