15
Crankshaft bearing collapsed
Incorrect assembled after repair
Remove, clean, use loctite
Rear roller shacking
Rear roller locked
Rear roller up with hollow coring
Tough circumstances
Unlock
Change speed and PTO rev’s
Put roller free on the ground
Change machine settings.
13.0 MAINTENANCE.
Pre-Delivery-Inspection
Check bolts/ nuts
Connect the unit to a tractor
Run unit for 5 min
See instructions in this manual
Look and listen
After
first
20 hours
(new or repaired)
Grease PTO and rollers
Check bolts/nuts
Look closely at machine
4 shots each EP 2
After
every
100 hours
Grease PTO and rollers
Check bolts/ nuts
Look closely at machine
Grease spindles front roller
4 shots each EP 2
After
every
500 operating
hours.
Replace the oil in the
gearbox.
Use 80W90 (5 liter).
14.0 EU-Declaration
.
We, Redexim Utrechtseweg 127 3702 AC Zeist Holland, hereby declare fully on our authority that
the product:
VERTI-DRAIN 7316, WITH MACHINE NUMBER AS INDICATED ON THE MACHINE AND
IN THIS MANUAL,
to which this declaration relates is according to the stipulation of the 2006/42/EC directive for
machines as well as the following standards: NEN-EN-ISO 12100 : 2010 and NEN-EN-ISO 13857 :
2008.
Zeist, 01/10/09
A.C. Bos
Manager Operations & Logistics
Redexim Holland