21
12.0 MAINTENANCE
Before start-up:
Check bolts/nuts
Connect machine to a tractor
Allow the machine to idle for
5 minutes.
Mount the tines
See instructions in this
manual
Look and listen
See Chapter 15, Options
Weekly
Check gearbox oil level
Clean the machine
After
first
20 hours of
operation (new or repaired)
Lubricate PTO and roller
bearings
Check bolts/nuts
Check V-belt tension
2 shots with EP 2
After
first
100 hours of
operation (new or repaired)
Lubricate PTO and roller
bearings
Check bolts/nuts
Change gearbox oil
Check condition and tension
of V-belts
2 shots each EP 2
Use SAE 90 W
After
every
100 hours of
operation
Lubricate PTO shaft and
roller bearings
Check bolts/nuts
Take a good look at the
machine
Lubricate front roller spindles
Check V-belts
2 shots each EP 2
After
every
500 hours of
operation
Change gearbox oil
Use SAE 90 W
.
Содержание Verti-Core III 1600
Страница 22: ...22 13 0 LUBRICATION PIONTS Fig 13...