
SRP - User manual
Ref.: RX182/006
Version 01/2017 - English
This document must not be reproduced nor information therein disclosed without our authorization
Page 27 / 28
8.5 Preload setting
– rotary drive
In case of a rotary application, respect the following procedure.
8.5.1
Installation on the machine
Ring gear mounting tolerances: check the run-out of the ring gear with a pin every 20 teeth. Compare the
values with the norm ISO1328-2. For crown gear quality, please consult us.
8.5.2
SRP parallelism tolerances, height setting, tooth meshing validation
Follow the procedure in chapter 7.
8.5.3
Shaft alignment
See chapter 8.2.
8.5.4
Preload setting
See chapter 8.4.
Содержание SRP0
Страница 148: ...SRP 用户手册 Ref RX182 006 Version 01 2017 Chinese 未经我们许可 严禁对此文档进行复制 传播 Page 6 28 ...
Страница 149: ...SRP 用户手册 Ref RX182 006 Version 01 2017 Chinese 未经我们许可 严禁对此文档进行复制 传播 Page 7 28 ...
Страница 171: ......
Страница 174: ......