background image

SunRise – Installation Manual

 

RE_PROD_0005 Version 3 

Page 5 of 28 

Issue Date 16/11/2020 

 
 
 
 

 

SunRise Weight:

 87kg plus 42kg per Troppo battery 

               Or   

32kg per US3000 battery 

Dimensions:  

1040 H x 969 W x 544 D [mm] 

SunRise Minimum Clearance 

According to AS/NXS 5139

 

Dimensions & Clearance 

SunRise (Mini) Weight:

 61kg plus 42kg per 

Troppo battery 

Or   

32kg per US3000 battery  

Dimensions:  

1040 H x 669 W x 543 D [mm] 

Содержание SunRise Single Phase

Страница 1: ...SunRise Installation Manual RE_PROD_0005 Version 3 Page 1 of 28 Issue Date 16 11 2020 SunRise Home Battery System Model Single Phase Installation Manual...

Страница 2: ...tallation Manual RE_PROD_0005 Version 3 Page 2 of 28 Issue Date 16 11 2020 RedEarth Energy Storage Ltd 15 Fienta Place Darra QLD 4076 Australia Tel 1800 733 637 Email info redearth energy Web www rede...

Страница 3: ...guide only and compliance to appropriate standards is the responsibility of the installer Relevant standards are listed below AS NZS 3000 2018 Wiring rules AS NZS 5033 2014 amdt 1 2 Installation and s...

Страница 4: ...an also easily be retrofitted to an existing PV solar system The SunRise combines an AS4777 2 certified SunGrow 5kW inveter SH5K 30 with the following battery options Up to 6 Troppo batteries 48VDC Li...

Страница 5: ...Weight 87kg plus 42kg per Troppo battery Or 32kg per US3000 battery Dimensions 1040 H x 969 W x 544 D mm SunRise Minimum Clearance According to AS NXS 5139 Dimensions Clearance SunRise Mini Weight 61k...

Страница 6: ...30 facing outwards and all the connections to it are on the bottom side Also in this area are the terminal blocks that will communicate with the meter Middle This general area is where the batteries a...

Страница 7: ...Rise pre wired enclosure Sungrow SH5K 30 inverter SunRise User Manual SunRise Installation Manual Battery Specifications Spare Parts Kit o Stickers Traffolytes for a complete install o MC4 connectors...

Страница 8: ...ux Earth Fault Alarm 4 5 MSB Meter 5 Turn on Shutdown 6 Commissioning 7 Monitoring and Communications 8 Finalising and Handover Step 1 Transporting The SunRise system is wrapped in foam heavy duty car...

Страница 9: ...ry Allow spacing around the system to comply with current installation standards The SunRise has four holes in the base to allow for securing This can be done with dynabolts or material appropriate sc...

Страница 10: ...the RHS Here are the connection point needed for an install 4 1 Solar SunRise has 2 Maximum Power Point Trackers MPPTs and allows for 1 array to be installed on each For ease installation both MPPTs...

Страница 11: ...up NOTE When installing the battery cable simply push it onto the terminal until you hear a click Remove the bolt that holds the earth cable to the battery Remove the front rail that holds the batter...

Страница 12: ...hear a click Remove the CAT5 communication cables Remove the bolt that holds the earth cable to the battery Unclip the necessary fans so that the battery can be removed without bumping into it NOTE D...

Страница 13: ...screwdriver The Terminal Blocks are labelled as shown to the right 4 3 Auxiliary Earth Fault Alarm RedEarth s Sunrise has two terminal blocks for the installation of a third party alarm These 2 termin...

Страница 14: ...the Sungrow Meter be sure to have it on the non essential side and have the CT clipped in between the Meter and the Main Circuit Breaker with the arrow pointing towards the loads The communication be...

Страница 15: ...all other times the Turn ON procedure is the reverse of the shutdown procedure If using Troppo batteries to turn ON the unit for the first time you must follow the steps below 1 Switch ON all individ...

Страница 16: ...the first time you must follow the steps below 1 Switch ON the all battery POWER switches 2 Press the SW red button on the Master Battery 3 Switch ON the BATTERY SYSTEM D C ISOLATOR 3 4 Switch ON both...

Страница 17: ...d on the RHS of the unit 1 Turn OFF all AC circuit breakers 1 2 Switch OFF the SOLAR D C ISOLATORS 2 3 Switch OFF the BATTERY SYSTEM D C ISOLATOR 3 NOTE The breaker on the BMU also disconnects the bat...

Страница 18: ...r Manual on how to make these alterations without compromising the existing configuration NOTE This must be done by a qualified person After successful installation the LDC screen will display as belo...

Страница 19: ...to the RJ45 port on the monitoring hardware As long as the 4G reception is adequate or properly hardwired to the router this does not require commissioning as it is done and tested in factory NOTE Ins...

Страница 20: ...h should be in the upwards position I BYPASS OPERATION In the ByPass operation mode the system will completely bypass the inverter and the grid will provide power directly to the EPS loads For this to...

Страница 21: ...the RedEarth Customer Community Additional batteries for system expansion Remote and ongoing monitoring option Extended warranty option Miscellaneous spare parts SunRise Power Kit PV panels racking a...

Страница 22: ...SunRise Installation Manual RE_PROD_0005 Version 3 Page 22 of 28 Issue Date 16 11 2020 Appendix A Single Line Diagram Power...

Страница 23: ...SunRise Installation Manual RE_PROD_0005 Version 3 Page 23 of 28 Issue Date 16 11 2020 Appendix A Single Line Diagram Communications...

Страница 24: ...SunRise Installation Manual RE_PROD_0005 Version 3 Page 24 of 28 Issue Date 16 11 2020 Appendix A Single Line Diagram Main Switchboad Generic...

Страница 25: ...h per Troppo 4 1 8 2 12 3 16 4 20 5 24 6 3 5kWh per US3000 3 5 7 1 10 6 14 2 17 7 AC Input and Output Rated AC Voltage 230V Rated AC Frequency 50Hz Max Input Output Power 5000VA Max Input Output Curre...

Страница 26: ...SunRise Installation Manual RE_PROD_0005 Version 3 Page 26 of 28 Issue Date 16 11 2020 Appendix B Technical Specifications SH5k 30...

Страница 27: ...al RE_PROD_0005 Version 3 Page 27 of 28 Issue Date 16 11 2020 Short circuit Current ISC 1x 0 4 kA 2x 0 8 kA 3x 1 2 kA 4x 1 6 kA 5x 2 0 kA 6x 2 4 kA UN Number 3481 Appendix B Technical Specifications L...

Страница 28: ...ation Manual RE_PROD_0005 Version 3 Page 28 of 28 Issue Date 16 11 2020 Short circuit Current ISC 1x 0 4 kA 2x 0 8 kA 3x 1 2 kA 4x 1 6 kA 5x 2 0 kA UN Number 3481 Appendix B Technical Specifications P...

Отзывы: