1. Ensure that a correct grounding point is used. Bad grounding of the unit will result in poor or no operation.
2. Do NOT use the BMIS to shut off the engine except in an emergency or for routine testing. Use the ignition
key as per normal vehicle operation. It is recommended for an engine shutdown test, to perform this on a fully
charged battery, or allow a few minutes of engine operation beforehand to recharge the battery as much as
possible. Following these recommendations will minimise the possibility of damage or accelerated wear to
vehicle electrical systems.
3. Ensure unused holes in the connector are filled with cavity plugs as contamination ingress may damage the
BMIS or connector.
4. To prevent contamination ingress, do not insert multiple wires into a single Deutsch connector terminal.
5. For vehicles fitted with SCR / Adblue, it is recommended to restart the truck engine immediately after testing
if isolating via the BMIS. Allow 30 seconds minimum or as per the manufacturer’s recommendations between
key off and isolating the BMIS to allow the SCR system to purge. Refer to the Vehicle manufacturer’s manual
for further information.
CONTENTS
Table of Contents
Page
Warnings & Safety Instructions
01
Contents 02
Specifications 03
1. Installation
04
1. Mounting the BMIS
04
2. Wiring Connections
09
3. Data Connector Wiring Diagram
10
2 User Guide
11
1. Operating the BMIS
12
2. LED Indication
12
3. Faults
12
1. LED Fault & Self-test Conditions
12
2. Flashing LED Diagnosis
12
3. Troubleshooting
13
1. Remote Switch
13
2. Troubleshooting Flow-chart
13
3. Battery Not Charging
14
4. FAQs
14
5. Tech Tips
14
6. Maintenance and Cleaning
15
7. Standards & Testing
16
8. Notes
17
9. Two Year Warranty
18
2
WARNINGS & SAFETY INSTRUCTIONS
Содержание BMIS series
Страница 1: ...Battery Master Isolation Switch BMIS 4PN BMIS 4PP...
Страница 18: ...17 8 NOTES...