41
A
X
X
X
X
G
G
G
z
41
6 - INSTALLATION AND ASSEMBLY OF BOILER
Technical Dept. - All rights reserved - Reproduction is prohibited
When the additional kit for automatic tubulators is also present.
The operations to be done are:
•
Remove the protection “
z
” (detail
G
) from the left-hand side of the boiler, undoing the 4 screws “
x
”.
•
Knock out the pre-perforated panel “
A
”.
Содержание LOGIKA 25
Страница 79: ......