44
A
D
C
B
c
d
44
6 - INSTALLATION AND ASSEMBLY OF BOILER
•
Remove the terminals and connect the wires to the feeder as shown in the diagram:
A =
black
wire to connect to
V-
B =
red
wire to
V+
C =
blue
wire to neutral
N
D =
brown
wire to
L
•
Reassemble everything in position, putting the support back in its seat (inserting it and pushing it downwards).
•
Refasten the protection “
z
”.
•
Remove the handle for manual cleaning of the turbolators, slackening the screw (with a Phillips screwdriver).
•
Put the rubber cap, provided in the automatic turbolator kit, in the hole in the place of the handle.
Содержание LOGIKA 25
Страница 79: ......