34
M
R
R
M
M
R
M1
R1
R
10-HYDRAULIC CONNECTION
PLUMBING CONNECTION
IMPORTANT:
The connections depend on the type of System Configuration.
IMPORTANT!
If installing the boiler involves another pre-existing system complete with heating equipment (gas boiler, methane
boiler, fuel oil boiler, etc.), it is strongly recommended that you contact a qualified operator who subsequently will
be responsible for the compliance of the system with the applicable laws in force.
The Company will not be held responsible for damage to persons or things in the event of failed or incorrect operation
if the aforementioned warnings are not complied with.
IMPORTANT!!!
CLEAN THE ENTIRE SYSTEM BEFORE CONNECTING THE BOILER, IN ORDER TO REMOVE ALL RESIDUE AND DEPOSITS.
Upstream from the stove, always install shutters so as to disconnect it from the plumbing system should it be
necessary to move it, or when it requires routine and/or special maintenance.
Connect the stove using hoses so that the stove is not too strictly connected to the system, and to allow slight
movements.
HYDRAULIC CONNECTION
CAUTION!
OBLIGATION TO ASSEMBLE ANTI-CONDENSATION VALVE (KIT CODE 40A14002)
ANTI-CONDENSATION VALVE KIT CODE
40A14002
EXAMPLE OF KIT 40A14002 ASSEMBLY
TO ASSEMBLE KIT 40A14002, SEE INSTRUCTIONS ATTACHED TO THE
KIT ITSELF.
Attention! We recommend mounting a drain tap in point R.