22
S
S
t
u
4-UNPACKING
PREPARATION AND UNPACKING
The Compact 45 Easy Clean boiler is delivered complete with all its electrical, mechanical and hydraulic components (excluding the
circulator kit and thermostatic valve-OPTIONAL) and having been tested in the factory:
The box positioned above the boiler packaging contains the trolley (to facilitate moving and emptying out the ashes).
Remove the cardboard (fig.1), remove the brackets that secure the boiler to the pallet. There are two fixing brackets, one at the front and
one at the back (fig.2).
To remove the brackets:
• remove the three screws “
u
”
• remove the three screws “t”
• remove the two brackets “
S
”
The trolley packaging contains (material for assembly - see instructions):
• trolley
• 2 augers
• 2 elastic cotter pins
• 2 auger gaskets
Install the boiler in the area set aside for it, making sure it conforms to the requirements. The boiler body or unit must always be kept
in a vertical position when moved, and only ever moved using suitable lifting trolleys. Pay particular attention to the door and its glass,
protecting them from mechanical knocks that would compromise their integrity.
FIGURE 2 - REMOVING THE PACKAGE BRACKETS
FIGURE 1 - PACKAGING