24
500
500
1000
796
400
500
500
764
1335
500
764
686
764
5-POSITIONING
REQUIREMENTS FOR INSTALLATION OF THE PLANT - POSITIONING
The most important thing to do before installation of the boiler is to set aside a suitable area that meets the minimum requirements for
installation.
•
the minimum clearance in front of the product
for the purpose of cleaning, maintenance, etc. must be
1000 mm
;
• the minimum permissible distance between the back of the product and a wall must be
400 mm
;
• the minimum distance between the top of the product and a wall (ceiling) must be 5
00 mm
to ensure easy access to the heat
exchanger for cleaning and maintenance (e.g. for removing ash and possible installation of the pellet suction kit);
• the minimum clearance between the product and the wall (side) must be
500 mm
.