28
1
7 - INITIAL START-UP
The boiler will be subject to expansion and contraction during the start-up and cooling phases, therefore slight creaking noises may be
heard.
This is absolutely normal as the structure is made of laminated steel and must not be considered a defect.
It is extremely important to make sure the boiler is not immediately overheated and the temperature is increased gradually, initially using
low power.
DO NOT EXPECT HEATING EFFICIENCY IMMEDIATELY!!!
OPENING/CLOSING THE INTERNAL DOOR
ATTENTION!
The door must be closed properly for the boiler to work correctly.
to open the internal door lift and pull the handle towards you. In the event one needs to open the door while the boiler is running one
must use suitable heat protection clothing (for example leather gloves).
SETTINGS TO BE CARRIED OUT BEFORE THE INITIAL START-UP
Once the power cable is connected in the rear part of the product, turn the switch to position (
I
). To switch the stove on or off press key
1
on the control panel.
OPENING THE INTERNAL DOOR.
Содержание COMPACT 35
Страница 1: ...INSTALLATION AND USER GUIDE EN translation of original instructions PELLET BOILER COMPACT 35...
Страница 62: ......
Страница 63: ......