
Installing A Red Jacket Submersible LPG Pump-Motor Unit
Typical System Schemes with Submersible LPG Pump-Motor Unit
24
11
Excess flow valve
2
12
Excess flow valve
1-1/4
13
Excess flow valve
3/4
14
Remote control valve
2
15
Remote control valve
3/4
16
Relief valve
1/4
17
Safety valve
-
18
Excess flow valve - if design required
-
Optional
19
Excess flow valve - equalization line
3/4
Optional
20
Insulation joint
2
21
Insulation joint
1-1/4
22
Insulation joint
3/4
23
Filling hose
3/4
24
Filling nozzle
3/4
25
Break-away coupling
3/4
26
Hose connection with cap
3-1/4
27
28
Level indicator
-
29
Pressure gauge
1/2
30
Pressure control valve
1/4
31
Ball valve
2
32
Connection rod
-
33
Red Jacket submersible pump
125 mm (5 in.)
Minimum opening
34
Vent of pump well + equalization line
Table 8. Example System Components
Item
Description
Size (inches)
Remarks
Содержание LPG Premier
Страница 1: ...Manual No 051 327 1 Revision N Installation Guide LPG Premier LPG Premier MidFlow LPG Premier HiFlow...
Страница 38: ......
Страница 39: ......
Страница 40: ...For technical support sales or other assistance please visit www veeder com...