background image

6

Servicing and maintenance

18 / 24

BAL_K32_K42_M_EN_1V1_REC_121-006454677

6

Servicing and maintenance

6.1

General remarks

According to current legislation, the operator of an automatic door system is responsible for its main-
tenance and safety.

Accidents or defects can be avoided if the system operator takes good care of the system.

Testing

Type of test

Measure

Visual inspection

Check door leaves, guides, bearings, limiting devices, sensors, and the securing of
crushing and shearing points for damage.

Mechanical inspection

Check fastenings for tight fit.

Safety check (exit and es-
cape routes)

Check sensors, safety devices, and monitoring devices for tight fit and damage.

Function testing

Check functioning of switches, operators, controllers, power or energy storage
devices, and sensors.

Also check the adjustment of the safety devices and the setting of all movement se-
quences including the end points.

Servicing

Type of servicing

Measure

Adjusting and cleaning

Clean and adjust bearings, sliding points, and power transmission.

For documentation and information purposes, the testing and servicing work as well as the condition
of the system are recorded in a test log book. The test log book must be kept for at least one year or
until the next testing/servicing.

IMPORTANT

The testing and/or servicing interval according to the manufacturer's specification is at least 1
to 2 times a year.

IMPORTANT

The recommended and planned spare parts and wearing parts can be requested from your
service center.

6.2

Monthly inspection work performed by the operator

The monthly tests and inspections of individual components by the operator require little time and
serve in particular to prevent accidents caused by improper handling of the system. Depending on the
equipment of the plant, we recommend that the following inspection work be carried out on a monthly
basis.

Test / Inspection

Procedure

Expected results

Visual inspection of all 

safety strips

– Visually inspect all safety strips.

– The safety strips can not have

any mechanical damage and they
must be installed correctly and
firmly over the entire length.

Door leaves / Side screens

– Verify the state of the glazing.

– Verify the state of the seals / pro-

files.

– No glass damage.

– No seals torn off (energy loss).

– The door is the "visit card" of your

company. Take care that it is
maintained in a perfect condition.

Содержание K 32 M

Страница 1: ...record K 32 M K 42 M User manual Your global partner for entrance solutions www record group ...

Страница 2: ...Document identification Article nr 121 006454677 Version 1 1 Publication date 05 07 2022 Translation of the original manual Subject to technical modifications Copyright agtatec ag ...

Страница 3: ...Safety strips on turnstile wings 13 4 Options 14 4 1 Lighting control 14 4 2 Speed control 14 4 3 Foldable turnstile wings and or foldable drum walls 14 4 4 Turnstile lock mechanisms 15 4 4 1 Electromagnetic turnstile lock 15 4 4 2 Electromagnetic turnstile lock Fail Secure 15 4 4 3 Turnstile bar bolt lock 16 4 4 4 Turnstile corner lock 16 4 5 Night shield variations 16 4 5 1 Manual night shield 1...

Страница 4: ... 4 24 BAL_K32_K42_M_EN_1V1_REC_121 006454677 List of changes Change Location Complete revision of all Sections and content Entire document New Section structure Entire document Revision of all graphics Entire document ...

Страница 5: ...ad to severe injury or death DANGER Against an imminent or latent hazardous situation that could lead to electric shock and cause serious injury or death 1 2 Intended purpose of use The system is designed exclusively for use as a pedestrian passage The installation must only occur in dry areas If there are deviations then proper waterproofing and water drains will be required on site Any other app...

Страница 6: ...y overnight ð Settings should only be made by personnel qualified to do so ð Do not disassemble put out of operation or manipulate safety devices ð Have faults rectified by specialist personnel or by personnel qualified to do so ð Have service and maintenance carried out according to locally applicable regulations or accord ing to a maintenance contract CAUTION Risk of malfunctions material damage...

Страница 7: ...m when it is moving ð Do not open or remove protective covers during operation ð Do not permanently remove covers from the system ð Only carry out inspection service maintenance and cleaning when the system is stationary and switched off CAUTION Danger of material damage or injury due to non functioning safety devices a If safety devices are not functioning manipulated or put out of operation ther...

Страница 8: ...ors from closing ð Have inspection service and maintenance of the fire protection system carried out in accordance with locally applicable regulations or according to a maintenance contract ð Have the fire protection system checked and maintained according to the state of the art 1 4 State of technology This system was developed using state of the art technology and officially recognized technical...

Страница 9: ...protects personnel in busy work areas from collisions with vehicles Depending on the place of work and the working environment the protective equipment varies and must be adapted accordingly In addition to protective equipment for specific work the work site may require other protective equipment for example a harness In hygiene protected areas special or additional requirements of personal protec...

Страница 10: ... Carl Benz Str 5 15 D 77972 Mahlberg It is prohibited to reproduce distribute or use the manuals for purpose of competition without the writ ten authorization of BLASI GmbH Violation of the here stated copyrights will be prosecuted and fined with compensation of damage Subject can change without prior notice Differences between product and manual are thereby possible 2 3 Product identification The...

Страница 11: ...k Disassembly Assembly Commissioning Operation Audit Main tenance Troubleshooting Decommissioning The qualified personnel have several years of professional experience in the technical field e g as mechanics or machine fitters The qualified personnel are aware of the residual risks arising from the installation site and due to their professional training knowledge and experience are able to carry ...

Страница 12: ...sage height I Cladding height J Total height Q Total diameter T Exterior diameter U Interior diameter 3 1 1 Main mechanical components Abbreviation Description a Drum wall Curved fixed aluminum frame for supporting curved glass or panelling b Drum wall edge Fixed structure made of vertical frame profiling for accommodating control units c Rotation unit turnstile Rotating inner part of the door ...

Страница 13: ...n optional night shield can be mounted on the system The ceiling lighting is usually controlled by an on site light switch or a building management system Depending on the equipment a speed control brake is integrated If the rotation speed of the system is too fast caused by persons or wind the speed control brake can be used to limit the speed to the preset value 3 3 Safety features 3 3 1 Safety ...

Страница 14: ...e equipped with hinged turnstiles and or in case of a three wing system with hinged drum walls If a turnstile leaf and or a drum wall is manually opened this condition is signaled to the system con trol via a monitoring switch At the same time the turnstile movement is immediately stopped in all op erating modes and the system control is switched off To continue the set operating mode all turnstil...

Страница 15: ...r until you hear the locking pin en gage Ensure that the turnstile can no longer be rotated manually 4 4 2 Electromagnetic turnstile lock Fail Secure NOTICE Fail Secure Monostable locking locked without current The system is equipped with a turnstile lock In the operating mode LOCKED the turnstile is automat ically locked in the home position and unlocked when another operating mode is selected If...

Страница 16: ...ingers or hands getting crushed sheared or pulled in ð To avoid crushing the operator must have a clear view of the night shield during the OPENING and CLOSING process NOTICE If the night shield is manually locked i e with a bar lock then please ensure that the night shield wings are manually unlocked before using the key reversing switch Switch example It can be operated with the key reversing sw...

Страница 17: ...al Illumination Mains voltage 230 VAC Frequency 50 60 Hz Nominal power max 120 W Mains fuse 10A circuit breaker with tripping characteristic C or K Control voltage 12 VDC Safety class 1 Degree of protection IP 20 Electrical night shield Mains voltage 230 VAC Frequency 50 60 Hz Nominal power max 120 W Mains fuse 10A circuit breaker with tripping characteristic C or K Control voltage 24 VDC Safety c...

Страница 18: ... testing and servicing work as well as the condition of the system are recorded in a test log book The test log book must be kept for at least one year or until the next testing servicing IMPORTANT The testing and or servicing interval according to the manufacturer s specification is at least 1 to 2 times a year IMPORTANT The recommended and planned spare parts and wearing parts can be requested f...

Страница 19: ... installed correct and function Function test Night shield Close and lock the night shield Push to verify whether the night shield is locked securely The night shield is completely closed and locked Operator casing Check the attachment of the op erator casing It must be completely closed and must correctly engage into the hinges Function test of the speed control brake Rotate the turnstile faster ...

Страница 20: ... The use of road salt or gravel in front of the access areas and inside the plant must be avoided c It is recommended to impregnate the safety strips and sensors with a water repellent care product IMPORTANT Any other cleaning agents not mentioned above must not be used What Interval Cleaning agent General parts Weekly Damp cloth neutral to slightly al kaline aqueous wetting agent solu tion vinega...

Страница 21: ... Solutions No door function power failure Power failure Mains supply line interrupted Fuse defective Main switch off Check mains supply Check main switch Contact Service Door will not lock Door in not quite in the locked po sition Push the door into the locked po sition Door does not open Locking is stuck or jammed Locking device defective Manual unlocking Contact Service Door does not close Obsta...

Страница 22: ...etely disassembled in reverse order The automatic door mainly consists of the following materials Aluminum Linking profiles Gearbox Drive panel Door wing profiles and side profiles Various profiles and small parts Steel iron parts Stainless steel casing Floor panel Box recess for floor installation Optional spacer or reinforcement profiles Gear components springs Various small parts like fittings ...

Страница 23: ......

Страница 24: ...Your global partner for entrance solutions ...

Отзывы: