background image

4

REC Installation Manual - REC Alpha 72 Series  - IEC 61215 /61730
Rev A - 02.20 

Ref: NE-06-23

SAFETY MEASURES

Installers are responsible for the safe and effective installation and operation of the system and for adhering to all applicable local and national 

standards and regulations. All relevant local codes and regulations should be referred to and observed.

SAFETY IN THE WORKING AREA

Installation of REC solar panels may involve working on rooftops or raised platforms. Ensure all local regulations regarding working at heights and 

fall protection are followed. Before beginning work on an installation, ensure all working surfaces are structurally sound and capable of bearing the 

weight of employees and required equipment.

Preventing current generation

To prevent the panels automatically generating current (electricity) when exposed to light, shield the system with a non-transparent cover during 

installation, maintenance or repair work.

Specific hazards of DC electricity

The voltage produced by a single panel, and panels connected in series (voltages added together), or in parallel (currents added together) can be 

dangerous. Although the fully insulated plug contacts on the panel’s output cables provide touch-safe protection, the following points must be 

observed during handling to avoid the risk of sparking, fire hazards, burns and lethal electric shocks:

•  Exercise extreme caution when wiring panels and look out for damaged or dirty cables etc,
•  Never insert metallic or other conductive objects into plugs or sockets,
•  Ensure that all electrical connections are completely dry before assembly,
•  Keep all materials, tools, and working conditions dry and tidy,
•  Use appropriate safety equipment e.g., non-slip footwear, insulated gloves and insulated tools,
•  Solar panels produce current when exposed to sunlight. Do not connect the system to the inverter during solar exposure

DANGER - 

Electrical shock

Solar panels generate direct current (DC). Once current is flowing, breaking a connection (e.g., disconnecting two panels) can cause an electrical 

arc. Unlike low voltage AC wiring, DC arcs are not self-extinguishing; they are potentially lethal burn and fire hazards, capable of high temperatures 

that can destroy contacts and connectors:

•  Isolate the system and remove/open the inverter AC fuse/circuit breaker from the grid before carrying out any maintenance or repair work.
•  Follow inverter manufacturer’s installation, handling and operating instructions.
•  High-voltage components need sufficient time to discharge. Wait for the time specified by the manufacturer before commencing work. 
•  Do not use a panel which is broken or damaged. If the panel front glass is broken or laminate back sheet is damaged, it can expose personnel 

to hazardous voltages.

Содержание Alpha 72 Series

Страница 1: ...rec Alph 72 SERIES INSTALLATION MANUAL FOR ALL REC ALPHA 72 SOLAR PANELS CERTIFIED ACCORDINGTO IEC 61215 IEC 61730 STANDARDS...

Страница 2: ...AGEMENT 11 PANEL MAINTENANCE 12 RECYCLING 12 DISPOSAL OF OLD ELECTRICAL AND ELECTRONIC EQUIPMENT 12 PANEL CHARACTERISTICS 13 Technical Properties REC Alpha 72 Series 13 ANNEX 1 INSTALLATIONS ON WATER...

Страница 3: ...ore installers are responsible for the following Only qualified personnel must perform work on photovoltaic systems such as installation commissioning maintenance and repairs Be sure to follow the saf...

Страница 4: ...erved during handling to avoid the risk of sparking fire hazards burns and lethal electric shocks Exercise extreme caution when wiring panels and look out for damaged or dirty cables etc Never insert...

Страница 5: ...voiddamageordegradationtothepackagingorpanelcomponents pallets and panels must be stored in a controlled environment ideally internal where it is protected from the elements e g rain dust and direct s...

Страница 6: ...bundled together so loops are as small as possible String configurations must be checked before commissioning If open circuit voltage Voc and short circuit current Isc deviate from specification this...

Страница 7: ...mp grip length and the central point of the fixation e g the bolt is fully within the required clamping zone as indicated on the following pages CLAMP SPECIFICATIONS Clamp installation must be carried...

Страница 8: ...g 3 Clamping zones for panels with rails parallel to short side CAUTION The minimum grip length of each clamp and its center point must be fully located in the same color zone to be rated to that load...

Страница 9: ...eledgeofeachpanelmustbesupportedbytworails figs 2a 2b ofaluminiumorgalvanized steelsuitablefortheapplicationandappropriateforthelocalenvironment Observethefollowingprocedureswhenusingmountingholes The...

Страница 10: ...hown in fig 9 and can be further identified by the grounding symbol stamped in the frame next to it Check all applicable requirements before beginning installation Suitable grounding clips lugs or oth...

Страница 11: ...standards e g IEC 62852 or UL 6703 to ensure they are fit for purpose and safety Useofanychemicalsorlubricantsontheconnectorsorcontactsmayonlybecarriedoutinlinewiththeconnectormanufacturer sinstructio...

Страница 12: ...local guidelines and regulations By ensuring REC solar panels are disposed of correctly you will help prevent potential negative impact on the environment and human health The majority of the panel c...

Страница 13: ...ewithIEC62790 Connectors St ubliMC4Evo2 PV KBT4 EVO 2 PV KST4 EVO 2 4mm inaccordancewithIEC62852 IP68onlywhenconnected Cable 4 mm solar cable 1 2 m 1 3 m in accordance with EN 50618 Dimensions 2063 x...

Страница 14: ...installation must have sufficient length and slack to prevent damage due to water level changes and wave motions ii Mounting panels Installation of REC solar panels must be in accordance with the afor...

Страница 15: ...r instructions to ensure optimum mounting of MLPE device and prevent any slippage during operation MLPE devices may also be attached to the mounting construction In such cases refer to the instruction...

Страница 16: ...nformity of the product with the requirements of the above mentioned EC Directive and its conformity with the safety requirements of the EC Low Voltage Directive 2014 35 EU DIN EN 61215 VDE 0126 31 20...

Страница 17: ...RECInstallationManual RECAlpha72Series IEC61215 61730 Rev A 02 20 Ref NE 06 23 17 DOCUMENTHISTORY Date Revision Reason 02 2020 A First release...

Страница 18: ...RECSOLARPTE LTD 20TUASSOUTHAVENUE14 SINGAPORE637312 SINGAPORE Tel 6564959228 Mail post recgroup com www recgroup com 18 RECInstallationManual RECAlpha72Series IEC61215 61730 Rev A 02 20 Ref NE 06 23...

Отзывы: