14
1
w
.
If your top beam (D) was not previously
cut (Step 3), measure your finished
opening, deduct 1/2”, and cut.
Insert mounting brackets (H) in each end
of top beam (D) (Fig. 1); ensure proper
alignment (Fig. 2).
2
w
.
Place the top beam (D), as oriented in
Fig. 2, between the posts and on top of
the balusters (Fig. 3).
Secure the brackets to the post using
mounting screws (J) (Fig. 4). Secure the
brackets to the beam using mounting
screws (K) (Fig. 5).
3
w
.
Measure for length (Fig. 6) and cut the
wood top cover (A) to fit.
Use a 3/16” bit to drill holes through the
top beam (D) approximately every 12”
(between balusters). Holes should be
drilled down center baluster channel.
Set wood top cover (A) on top beam (D)
and secure in place with supplied screws
(Fig. 7).
Return to Step 12, page 7.
(Fig. 1)
Ensure the four tabs on bracket
nest on beam as depicted.
(Fig. 2)
(Fig. 3)
(Fig. 4)
(Fig. 5)
(Fig. 6)
(Fig. 7)
WOOD COVER RAIL INSTALLATION