
6
Pre-delivery Checklist
(Copy for Return to RCI at back of this manual)
After the unit has been assembled and lubricated and prior to delivery to customer, the merger
needs to be inspected thoroughly to ensure it is in proper working order. The following checklist
must be reviewed and each item found to be satisfactorily completed.
Windrow merger has been setup according to the instructions included in this
manual.
All grease fittings have been lubricated.
All guards, shields and safety decals are in place, securely fastened, and operate correctly.
All nuts and bolts have been tightened and inspected.
Adjustments have been made as described in the Adjustments section of this manual
Crop guides at belt installed properly.
Gauge wheels installed and inflated properly.
All moving parts operate freely.
Belt tension set properly.
Extension belt tension set properly.
All applicable warranty information recorded.
I acknowledge that the pre-delivery service was performed and the unit is ready for delivery to
the customer.
________________________ _________________________
___________________
Dealership’s Name
Representative
Date
_______________________ __________________________ ___________________
Model Number
Serial Number
Date Sold
Owner’s Name and Address
Name_______________________________________________
Address_____________________________________________
City, State, Zip _______________________________________
Original: Enclose in manual and give to customer at time of delivery.
Copy: Dealership
Copy: RCI Engineering LLC
RCI Engineering LLC
Fax: 920-387-9804
Email: [email protected]
Mail: 208 River Knoll Drive, Mayville, WI 53050
Содержание 186M
Страница 8: ...7 This Page Intentionally Left Blank ...
Страница 10: ...9 This Page Intentionally Left Blank ...
Страница 16: ...15 This Page Intentionally Left Blank ...
Страница 32: ...31 This Page Intentionally Left Blank ...
Страница 34: ...33 This Page Intentionally Left Blank ...
Страница 35: ...34 Hydraulic Functional Schematic ...
Страница 36: ...35 This Page Intentionally Left Blank ...
Страница 37: ...36 Bolt and Screw Torque Values ...
Страница 38: ...37 This Page Intentionally Left Blank ...
Страница 40: ...39 This Page Intentionally Left Blank ...
Страница 42: ...41 Hitch And Wheel Components ...
Страница 44: ...43 Hitch Pivot Components ...
Страница 46: ...45 Pickup Components ...
Страница 48: ...47 This Page Intentionally Left Blank ...
Страница 50: ...49 Conveyor Components ...
Страница 52: ...51 Extension Components ...
Страница 54: ...53 Long Extension Components Optional ...
Страница 56: ...55 Windguard Components ...
Страница 58: ...57 Motor and Manifold Components ...
Страница 60: ...59 ...
Страница 62: ...61 Decals Left ...
Страница 64: ...63 Decals Right ...
Страница 66: ...65 Decals Back ...
Страница 68: ...67 This Page Intentionally Left Blank ...
Страница 70: ...69 This Page Intentionally Left Blank ...
Страница 72: ...71 208 River Knoll Drive Mayville WI 53050 920 387 9804 Fax 920 387 9806 www rciengineering com ...