
17
8) Install the shipping strap from the hitch
as a stop on the lower side of the
tongue frame. See Figure 10.
IMPORTANT: Ensure that the plate is
arranged with the hook slot towards the
front of the merger and the wide area
extended under the frame of the merger.
9) Install pin at hydraulic cylinder. Install
spring at pivot link. See Figure 10.
10) Grease unit. See “Maintenance”
Section of this manual.
11) Verify tire pressures are set correctly.
See “Service” section of this manual.
12) Use the shipping blocks to create a
ramp in front of the skid at the tires.
Connect the unit to a tractor and pull
from the shipping skid. See “Attach
Merger to Tractor” in the next
section.
Figure 10. Lift Cylinder Assembly
Key 1 – Cylinder
Key 2 – Spring
Key 3 – Pin Key 4 - Stop
Содержание 186M
Страница 8: ...7 This Page Intentionally Left Blank ...
Страница 10: ...9 This Page Intentionally Left Blank ...
Страница 16: ...15 This Page Intentionally Left Blank ...
Страница 32: ...31 This Page Intentionally Left Blank ...
Страница 34: ...33 This Page Intentionally Left Blank ...
Страница 35: ...34 Hydraulic Functional Schematic ...
Страница 36: ...35 This Page Intentionally Left Blank ...
Страница 37: ...36 Bolt and Screw Torque Values ...
Страница 38: ...37 This Page Intentionally Left Blank ...
Страница 40: ...39 This Page Intentionally Left Blank ...
Страница 42: ...41 Hitch And Wheel Components ...
Страница 44: ...43 Hitch Pivot Components ...
Страница 46: ...45 Pickup Components ...
Страница 48: ...47 This Page Intentionally Left Blank ...
Страница 50: ...49 Conveyor Components ...
Страница 52: ...51 Extension Components ...
Страница 54: ...53 Long Extension Components Optional ...
Страница 56: ...55 Windguard Components ...
Страница 58: ...57 Motor and Manifold Components ...
Страница 60: ...59 ...
Страница 62: ...61 Decals Left ...
Страница 64: ...63 Decals Right ...
Страница 66: ...65 Decals Back ...
Страница 68: ...67 This Page Intentionally Left Blank ...
Страница 70: ...69 This Page Intentionally Left Blank ...
Страница 72: ...71 208 River Knoll Drive Mayville WI 53050 920 387 9804 Fax 920 387 9806 www rciengineering com ...