13
10. Changes at the software version
•
With software V01
•
New characteristics of the software V02:
Switch On Notice LSG :
Switch On Notice LSK :
1. Normal Operation
Even after the warm up phase is finished a new zero point is determined cyclical and the
linearization is calculated new when having a positive sensor drift (resistor bigger than to the
end of the warm up phase). By this even small gas concentrations (< 50 ppm) can be detected
safely.
2. Calibration (see point 3.1 „Change in the software for calibration V02“)